(4-7) Confirm that the activation is completed.
When the activation is completed, a display on the screen changes from the image in (4-4) to the one
below.
(5) Site setting
Follow the steps from (6) to (9) introduced in [3.4 Installation Procedure in Wireless Method] of this setup
manual.
(6) Removal of setting devices (PC and hub)
As shown as follows, remove the PC used for settings and the hub connected in step (1). Next, connect
the gateway to the customer’s network.
Содержание RM-CGW-E1
Страница 11: ...ISTZ220019A 11 ...
Страница 21: ...ISTZ220019A 21 ...
Страница 22: ...ISTZ220019A 22 For PAC connected via interface ...
Страница 23: ...ISTZ220019A 23 ...
Страница 24: ...ISTZ220019A 24 For heat source unit ...
Страница 26: ...ISTZ220019A 26 ...
Страница 28: ...ISTZ220019A 28 ...
Страница 32: ...ISTZ220019A 32 9 User addition and authority setting Follow the steps below to register the user in the site ...
Страница 36: ...ISTZ220019A 36 This completes the installation procedure ...
Страница 38: ...ISTZ220019A 38 ...
Страница 51: ...ISTZ220019A 51 This completes the installation procedure ...