4 PROCEDURES BEFORE OPERATION
21
4
4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount a temperature input module in any desired configuration.
2.
Wiring
Perform wiring of thermocouples or resistance temperature detectors to a temperature input module.
3.
Adding a module
Add a temperature input module to a module configuration by using the engineering tool. For details, refer to the following.
GX Works3 Operating Manual
4.
Module settings
Set up the parameters of the temperature input module by using the engineering tool. For details, refer to the following.
MELSEC iQ-R Channel Isolated Thermocouple Input Module/Channel Isolated RTD Input Module User's Manual
(Application)
5.
Offset/gain setting
Perform the offset/gain setting to set a user range.
6.
Programming
Create a program. For details, refer to the following.
Содержание R60RD8-G
Страница 2: ......
Страница 14: ...12 MEMO ...
Страница 18: ...16 1 PART NAMES MEMO ...
Страница 24: ...22 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 41: ...7 OFFSET GAIN SETTING 7 1 Setting Procedure 39 7 13 Click Yes button ...
Страница 47: ...I 45 MEMO ...
Страница 51: ......