[
VII
Control ]
- 90 -
HWE1517A
GB
(2)Water flow rate adjustment operation (When the secondury side control is disabled)
Checking the flow rate after the flow rate adjustment operation
The flow rate adjustment operation adjusts the pump output and water flow rate valve opening to determine how to
match the flow rate characteristic to the local circuit.
Use the method below (*3
1
to
4
) to check the operation
result (characteristic).
If air bleeding was not done fully and the map not created properly, a water shutoff error, high pressure
error or other problems will occur when operating the system. Check the points below in this case. If the
values are abnormal, redo the air bleeding and flow rate adjustment operations.
(*3)
1
Set the PCB’s DIP switches as shown below.
2
Press SWP3 repeatedly to change the code shown in the PCB’s display. The code changes with each
press (*4).
Continue pressing SWP3 until ‘dxx’ is displayed in the PCB’s digital display.
(‘dxx’ is a code that stores the flow rate for a given pump output opening and valve opening. See Table 1.)
*4 If the flow rate adjustment operation has never been performed, ‘ng’ appears after the system startup
operation. Perform the flow rate adjustment operation in this case.
3
Press SWP1 or SWP2 to display the operation result (flow rate characteristic) corresponding each flow rate code
‘dxx’ in Table 1 and write them down.
Table 1
<Check result>
n
o
i
t
a
n
a
l
p
x
e
l
a
t
n
e
m
e
l
p
p
u
S
s
t
n
i
o
p
k
c
e
h
c
d
n
a
n
o
i
t
a
r
e
p
O
s
t
n
e
t
n
o
C
p
e
t
S
a
Water level check
Check the water level is neither at the full or
empty level.
Water is supplied even when the target water level
has been reached.
b
Power operation
Turn the power ON.
If the startup operation has not finished, SW2-9
and SW2-3 need to be set as a stopgap measure
(see Note 1).
If this flow rate adjustment operation has never
been performed ‘--ng’ is displayed.
c
Operation
procedure
Change the setting of PCB slide SWS1 from
REMOTE to LOCAL.
-
d
Operation
procedure
Change the setting of SW1-6 from OFF to ON.
* The pump operation and flow rate adjustment
valve opening are automatically adjusted, and
the flow rate is measured in 30 second intervals.
* You can check whether this flow rate adjustment
operation has ended or is underway using the
setting given in Note 2.
-
.
F
F
O
o
t
N
O
m
o
r
f
6
-
1
W
S
f
o
g
n
i
t
t
e
s
e
h
t
e
g
n
a
h
C
1
n
o
i
t
a
r
e
p
o
p
o
t
S
e
f
Stop operation 2
Change the setting of PCB slide SWS1 from
LOCAL to REMOTE.
-
3
W
S
2
W
S
-10
-5
-6
-7
-8
-9
-10
OFF
OFF
OFF
OFF
OFF
ON
ON
Close <------------------ Water flow rate adjust valve opening ------------------> Open
Pump output opening/water flow rate
adjust valve opening
1600
1400
1200
1000
800
600
400
200
100
Flow rate (pump output opening 16%)
d01
d02
d03
d04
d05
d06
d07
d08
d09
Flow rate (pump output opening 27%)
d10
d11
d12
d13
d14
d15
d16
d17
d18
Flow rate (pump output opening 100%)
d19
d20
d21
d22
d23
d24
d25
d26
d27
Close <------------------ Water flow rate adjust valve opening ------------------> Open
Pump output opening/water flow rate
adjust valve opening
1600
1400
1200
1000
800
600
400
200
100
Flow rate (pump output opening 16%)
Flow rate (pump output opening 27%)
Flow rate (pump output opening 100%)
0000001906.book 90 ページ 2018年7月19日 木曜日 午前7時22分
Содержание QAHV-N560YA-HPB
Страница 1: ......
Страница 7: ...CONTENTS HWE1517A GB 0000001906 book 2 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 9: ... 2 HWE1517A GB 0000001906 book 2 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 21: ... I Read Before Servicing 14 HWE1517A GB 0000001906 book 14 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 23: ... 16 HWE1517A GB 0000001906 book 16 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 53: ... 46 HWE1517A GB 0000001906 book 46 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 65: ... 58 HWE1517A GB 0000001906 book 58 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 77: ... 70 IV Remote Controller GB HWE1517A 0000001906 book 70 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 79: ... 72 HWE1517A GB 0000001906 book 72 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 85: ... 78 HWE1517A GB 0000001906 book 78 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 91: ... 84 HWE1517A GB 0000001906 book 84 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 121: ... 114 HWE1517A GB 0000001906 book 114 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 127: ... 120 HWE1517A GB 0000001906 book 120 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 173: ... 166 HWE1517A GB 0000001906 book 166 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 175: ... X Attachments 168 HWE1517A GB 0000001906 book 168 ページ 2018年7月19日 木曜日 午前7時22分 ...
Страница 176: ......