100
OCH750A
OPERATING PROCEDURE
PHOTOS/FIGURES
4. Removing the thermistor <2-phase pipe> (TH6) and
thermistor <Ambient>(TH7)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Disconnect the connectors TH7/6 (red) on the controller cir-
cuit board in the electrical parts box.
Loosen fasteners for lead wires in the electrical parts box.
(4) Loosen the clamp for lead wires in the rear of the electrical
parts box.
(5) Pull out the thermistor <2-phase pipe> (TH6) and thermis-
tor <Ambient> (TH7) from the sensor holder.
Note: When replacing thermistor <2-phase pipe> (TH6) or
thermistor <Ambient> (TH7), replace it together.
Photo 5
Clamps
Clamps
Heat exchanger
Heat exchanger
Thermistor
<2-phase pipe>
(TH6)
Thermistor
<2-phase pipe>
(TH6)
Electrical parts
box
Electrical parts
box
Sensor holder
Photo 6
Lead wire of thermistor
<Ambient> (TH7)
HA30/36
HA42
Содержание PUZ-HA24NHA1
Страница 13: ...13 OCH750A 6 OUTLINES AND DIMENSIONS Unit mm in PUZ HA24NHA1 ...
Страница 14: ...14 OCH750A Unit mm in PUZ HA30NKA PUZ HA36NKA 1 1 1 ...
Страница 15: ...15 OCH750A Unit mm in PUZ HA42NKA1 1 1 1 ...
Страница 16: ...16 OCH750A 7 WIRING DIAGRAM PUZ HA24NHA1 ...
Страница 17: ...17 OCH750A PUZ HA30NKA PUZ HA36NKA ...
Страница 18: ...18 OCH750A PUZ HA42NKA1 ...
Страница 127: ...127 OCH750A ...