25
2. Start and finish of test run
• Operation from the indoor unit
Execute the test run using the installation manual for the indoor unit.
• Operation from the outdoor unit
By using the DIP switch SW4 on the control board of outdoor unit, test run can be started and finished, and its operation
mode (cooling/heating) can be set up.
1
Set the operation mode (cooling/heating) using SW4-2.
2
Turn on SW4-1 to start test run with the operation mode set by SW4-2.
3
Turn off SW4-1 to finish the test run.
• There may be a faint knocking sound around the machine room after power is supplied, but this is
no problem with product because the linear expansion pipe is just moving to adjust opening pulse.
• There may be a knocking sound around the machine room for several seconds after compressor
starts operating. But this is not a problem with product because the check valve itself generates
the sound because pressure difference is small in the refrigerant circuit.
Note:
The operation mode cannot be changed by SW4-2 during test run. (To change test run mode, stop the unit by SW4-1,
change the operation mode and restart the test run by SW4-1.)
OFF
1
2
ON
<SW4>
A B
C D
A
Stop
C
operation
B
Cooling
D
Heating
(PUZ only)
1. Refrigerant collecting (pump down)
Perform the following procedures to collect the refrigerant when moving the indoor unit or the outdoor unit.
1
Turn on the power supply (circuit breaker).
w
When power is supplied, make sure that “CENTRALLY CONTROLLED” is not displayed on the remote controller. If
“CENTRALLY CONTROLLED” is displayed, the refrigerant collecting (pump down) cannot be completed normally.
2
After the liquid stop valve is closed, set the SWP switch on the control board of the outdoor unit to ON. The compressor
(outdoor unit) and ventilators (indoor and outdoor units) start operating and refrigerant collecting operation begins. LED1 and
LED2 on the control board of the outdoor unit are lit.
w
Set the SWP switch (push-button type) to ON in order to perform refrigerant collecting operation only when the unit is
stopped. However, refrigerant collecting operation cannot be performed until compressor stops even if the unit is stopped.
Wait 3 minutes until compressor stops and set the SWP switch to ON again.
3
Because the unit automatically stops in about 2 to 3 minutes after the refrigerant collecting operation (LED1 is not lit
and LED2 is lit), be sure to quickly close the gas stop valve.
w
In case the outdoor unit is stopped when LED1 is lit and LED2 is not lit, open the liquid stop valve completely, and then
repeat step
2
3 minutes later.
w
If the refrigerant collecting operation has been completed normally (LED1 is not lit and LED2 is lit), the unit will remain
stopped until the power supply is turned off.
4
Turn off the power supply (circuit breaker.)
OC367C--1.qxp 07.6.20 0:56 PM Page 25
Содержание PUY-A12NHA
Страница 120: ...120 FUNCTIONAL PARTS PUZ A18NHA PUY A12NHA PUY A18NHA 1 2 3 4 5 6 7 8 9 10 11 12 23 13 16 17 15 18 19 20 22 21 14 ...
Страница 124: ...124 FUNCTIONAL PARTS PUZ A42NHA PUY A42NHA 12 3 5 6 10 2 9 1 7 8 11 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 4 1 18 ...
Страница 135: ...135 ...