16
SYMBOL
M-NET ADAPTER
NAME
TB7
CN5
CND
CN2M
SW1
SW11
Terminal Block<M-net connection>
Connector<Transmission>
Connector<Power Supply>
Connector<M-NET communication>
Switch<Status of communication>
Switch<Address setting : 1st digit>
SW12
LED1
LED2
LED3
LED4
LED5
Switch<Address setting : 2nd digit>
LED<Power Supply : DC5V>
LED<Connection to Outdoor Unit>
LED<Transmission : Sending>
LED<Transmission : Recelving>
LED<Power Supply : DC12V>
1 2 3 4 5 6
OFF
ON
PUZ-A18N
PUY-A12N
PUY-A18N
MODEL
SW6
*1 MODEL SELECT
SW10
1 2
OFF
ON
1 2 3 4 5 6
OFF
ON
1 2
OFF
ON
1 2 3 4 5 6
OFF
ON
1 2
OFF
ON
CN3
(WHT)
CN5
(RED)
CN2
(WHT)
CN4
(WHT)
2
1
1
2
CN52C
(BLK)
52C
2
1
TH8
1
2
1
6
72
3
4
5
N . F .
LO
NO
CNAC2
(RED)
1
3
CNAC1
(WHT)
1
3
1 2
(RED)
CN5
NI
E
LI
L1
GR
L2
S1 S2 S3
INDOOR
UNIT
TB1
ACL
MC
U
V
W
R
S
PFC
CB1
CB2
I P M
P . B .
CN5
(WHT)
1 2 3
LED2
SW1
SW11
SW12
LED3
LED4
TB7
LED1
LED5
45
3
2
1
2
1
CND
(WHT)
CN2M
(WHT)
M-NET SUBSTRATE
M-NET
A
B
S
CNVMNT
(WHT)
3
2
1
CNDM
(WHT)
CN51
(WHT)
3
2
1
5
4
2
13
CNMNT
(WHT)
CNM
(WHT)
4 5
3
2
1
LEV-A
(WHT)
LEV-A
C.B.
4 5 6
3
2
1
TH7/6
(RED)
63H
YLW)
TRANS
TH3
(WHT)
CNDC
(PNK)
CNF1
(WHT)
TH4
(WHT)
TH7
TH6
TH3
TH4
4
3
2
1
2
1
2
1
SW7
SW6
SW1
SW9
SW10
CN31
11
10
12 13 14
6
5
7 8 9
1 2 3 4
MF1
6
5
7
1
4
CN2
(WHT)
CNS
(WHT)
CNAC
(WHT)
CN4
(WHT)
21S4
(GRN)
4
3
2
2
1
1
CN52C
(RED)
2 1
5 6 7
LED1
LED2
3
1
3
X52
F1
F2
F4
F3
*1
*1
1
3 2
2
1
4
3
SW5
SW8
SW4
SWP
1
3
21S4
PUZ only
1
Optional M-NET adaptor
RED
BLK
WHT
POWER SUPPLY
208/230V 60Hz
NO FUSE
BREAKER
Symbols used in wiring diagram above are,
: Connector, : Terminal(block).
*Use copper supply wire.
TB1
MC
MF1
21S4
63H
TH3
TH4
TH6
TH7
TH8
LEV-A
ACL
Terminal Block<Power Supply, Indoor/Outdoor>
Motor for Compressor
Fan Motor
Solenoid Valve (Four-Way Valve)
High Pressure Switch
Thermistor<Outdoor Pipe>
Thermistor<Discharge>
Thermistor<Outdoor 2-Phase Pipe>
Thermistor<Outdoor>
Thermistor<Heat Sink>
Electronic Expansion Valve
Reactor
Power Circuit Board
Connection Terminal<U/V/W-Phase>
P.B.
U/V/W
Noise Filter Circuit Board
Connection Terminal<L1-Phase>
Connection Terminal<Ground>
N.F.
LI/LO
Connection Terminal<L2-Phase>
NI/NO
E
Fuse<6.3 A>
Controller Circuit Board
Switch<Forced defrost, Defect history
record reset, Refrigerant address>
Switch<Test Operation>
Switch<Function Switch>
Switch<Function Setup>
Switch<Pump Down>
Connector<Emergency Operation>
F1~4
SW1
SW4
SW5
SW7
Switch
SW8
SWP
CN31
CNM
CNVMNT
CNDM
Connector<A-Control Service Inspection Kit>
Connector
<Connected to Optional M-NET Adapter Board>
Connector
<Connected for Option (Contact Input)>
C.B.
Converter
PFC
Power module
IPM
Main Smoothing Capacitor
CB1~CB2
52C Relay
52C
SYMBOL
NAME
SYMBOL
NAME
SYMBOL
NAME
Connection Terminal<L1/L2-Phase>
R/S
CNMNT Connector
<Connected to Optional M-NET Adapter Board>
Switch<Model Select>
SW6
Switch
SW9
X52
Relay
LED1,
LED2
Light Emitting Diodes
<Operation Inspection Indicators>
Switch<Model Select>
SW10
Cautions when Servicing
!
WARNING: When the main supply is turned off, the voltage [340 V] in the main capacitor will drop to 20 V in approx. 2 minutes (input voltage: 230 V). When servicing, make sure that
LED1 (green) on the outdoor circuit board goes out, and then wait for at least 1 minute.
Components other than the outdoor board may be faulty: Check and take corrective action.
Do not replace the outdoor board without checking.
PUZ-A18NHA PUZ-A18NHA-BS PUY-A12/18NHA PUY-A12/18NHA
1
PUY-A12/18NHA
1
-BS
8
WIRING DIAGRAM
OC367C--1.qxp 07.6.20 0:56 PM Page 16
Содержание PUY-A12NHA
Страница 120: ...120 FUNCTIONAL PARTS PUZ A18NHA PUY A12NHA PUY A18NHA 1 2 3 4 5 6 7 8 9 10 11 12 23 13 16 17 15 18 19 20 22 21 14 ...
Страница 124: ...124 FUNCTIONAL PARTS PUZ A42NHA PUY A42NHA 12 3 5 6 10 2 9 1 7 8 11 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 4 1 18 ...
Страница 135: ...135 ...