GB
GB-29
WT07282X01
Ⓕ
Reducer etc.
Ⓖ
On-site piping (low-pressure side)
Ⓗ
On-site piping (high-pressure side)
Ⓘ
Outdoor unit twinning kit
Ⓙ
On-site piping to an outdoor unit (low-pressure side)
Ⓚ
In an R2 system: On-site piping to a BC controller (low-pressure side)
In a Hybrid City Multi system: On-site piping to an HBC controller (low-pressure side)
・
Connecting the on-site piping and the service valve piping
When routing the pipes through the front of the unit
High-pressure side
Low-pressure side
P200
Use the supplied connecting pipes
⑥
and
⑦.
Use the supplied connecting pipe
②
and the connecting elbow
④.
P250
Use the supplied connecting pipe
②
and the connecting
elbow
④
.
Use the supplied connecting pipe
①
.
P300
P350
Use the supplied connecting pipe
③
.
P400
Use the supplied connecting pipe
①
.
P450
Use the supplied connecting elbow
⑤
.
P500
High-pressure side
Low-pressure side
EP200
Use the supplied connecting pipe
⑥.
Use the supplied connecting elbow
⑤
and the connecting pipes
⑧
and
⑨.
EP250
Use the supplied connecting pipe
③
.
Use the supplied connecting elbow
⑤
and the connecting pipe
⑧.
EP300
EP350
Use the supplied connecting elbow
⑤
.
EP400
Use the supplied connecting pipe
①
.
EP450
EP500
When routing the pipes through the bottom of the unit
High-pressure side
Low-pressure side
P200
Use the supplied connecting pipe
⑥
.
Use the supplied connecting pipe
②
.
P250
Use the supplied connecting pipe
②
.
Sever the supplied connecting pipe
①
as shown in the figure
below with a pipe cutter.
Expand the end of the on-site piping. (ID ø22.2 mm (ø7/8 in))
P300
P350
Sever the supplied connecting pipe
③
as shown in the figure
below with a pipe cutter.
Expand the end of the on-site piping.
(ID ø28.58 mm (ø1-1/8 in))
P400
Sever the supplied connecting pipe
①
as shown in the
figure below with a pipe cutter.
Expand the end of the on-site piping. (ID ø22.2 mm (ø7/8
in))
P450
Expand the end of the on-site piping.
(ID ø28.58 mm (ø1-1/8 in))
P500
High-pressure side
Low-pressure side
EP200
Use the supplied connecting pipe
⑦
.
Use the supplied connecting pipes
⑧
and
⑨.
EP250
Use the supplied connecting pipe
④
.
Use the supplied connecting pipe
⑧
.
EP300
EP350
Expand the end of the on-site piping.
(ID ø28.58 mm (ø1-1/8 in))
EP400
Use the supplied connecting pipe
②
.
EP450
EP500
Содержание PURY-(E)P-YLM-A (-BS)
Страница 2: ......
Страница 62: ...GB 60 WT07282X01 ...