71
OPERATING PROCEDURE
PHOTOS
1. Removing the service panel and top panel
(1) Remove the service panel fixing screws (3 for front and 1
for right/ 5 × 12), then slide the service panel downward
to remove it.
(The service panel is fixed to the side panel (R) with a
hook on the right side.)
(2) Remove the top panel fixing screws (3 for front, 3 for rear
and 1 for right/ 5 × 12) to remove the top panel.
Note 1: When removing service panel and top panel at the
same time, count 2 less screws since they share
a screws.
Photo 1
2. Removing the fan motor (MF1)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the wire grille fixing screws (6 for front/ 5 × 12),
then slide the wire grille upward to remove it. (See Photo 1)
(4) Remove the screw of nut (1 for front/ M6), then slide the
propeller fan forward to remove it.
(5) Disconnect the connector CNF1 (WH) on the controller
circuit board in the electrical parts box. (See Photo 4)
(6) Loosen the clamps for the lead wire on motor support and separator.
(7) Loosen the edge cover for the lead wire on separator.
(8) Remove the fan motor fixing screws (4 for front/ 5 × 20)
to remove the fan motor.
Note 1: When attaching the fan motor, make sure to route
the cable through the hook below the fan motor
and fix firmly with the clamp.
Note 2: Tighten the propeller fan with a torque of 5.7
i
0.3 N·m.
Photo 2-1
Photo 2-2
3. Removing the electrical parts box
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Disconnect the power supply cable from terminal block.
(4) Disconnect the indoor/outdoor connecting wire from terminal block.
(5) Loosen the cable strap for the lead wire on the comp case (front).
(6) Disconnect the connectors CNF1 (WH), TH3 (WH), TH4
(WH), TH7/6 (RD), TH33 (YE), 63H (YE), 63HS (WH),
21S4 (GN), LEV-A (WH) and LEV-B (RD) from the con-
troller circuit board.
<Symbols on the board>
• Fan motor (CNF1)
• Thermistor <Liquid> (TH3)
• Thermistor <Discharge> (TH4)
• Thermistor <Ambient/ 2-Phase Pipe> (TH7/6)
• Thermistor <Comp. Surface> (TH33)
• High pressure switch (63H)
• High pressure sensor (63HS)
• 4-way valve (21S4)
• LEV (LEV-A, LEV-B)
(7) Disconnect the connectors ACL1 (RD), ACL2 (WH) and
ACL3 (BK) on reactors in the separator.*
1
(8) Remove the cover panel (front) fixing screws (1 for front
and 1 for right/ 5 × 12) to remove the cover panel (front).
(9) Remove the comp case (top) fixing screws (2 for front
and 1 for right/ 4 × 10) to remove the comp case (top).
(10) Remove the comp case (front) fixing screws (4 for front
and 2 for right/ 4 × 10) to remove the comp case (front).
(11) Loosen the clamps, fasteners, band and cable straps for
the lead wire in the electrical parts box and separator.
(12) To disconnect the COMP lead wire, remove the terminal cover,
then remove the terminal cover fixing screw of nut (1 for front/ M5).
(13) Remove the electrical parts box fixing screws (2 for front/ 5 × 12), then
slide the electrical parts box upward to remove it.
(The electrical parts box is fixed to the side panel (R) with a hook on
the right side, and to the separator duct with a hook on the left side.)
*
1
For SW75Y model only
Photo 3-1
Photo 3-2
PUHZ-SW75VAA.UK
PUHZ-SW75YAA.UK
PUHZ-SW75VAA-BS.UK PUHZ-SW75YAA-BS.UK
Propeller
Front panel
Fan motor fixing screws
Fan motor fixing
screws
Fan motor
Lead wire of
fan motor
Nut
Controller
circuit board
Terminal block
Valve bed
Reactors*
1
Comp case
(top)
Comp case
(front)
Electrical parts box
Electrical parts box
fixing screws
Cover panel
(front)
Cover panel
(Rear)
Top panel fixing screws
Top panel
Service panel
fixing screws
Service panel
Side panel (R)
Wire grille
fixing screws
Wire grille
fixing screws
Wire grille
Service panel
fixing screws
OCH651