59
OPERATING PROCEDURE
PHOTOS
6. Removing the vane motor
(1) Remove the air intake grill.
(2) Remove the left side panel.
(3) Remove the relay connector of vane motor.
(4) Remove the electrical box.
(5) Remove the screws of vane motor, then remove vane
motor.
(Note)
Connect the lead wires and connectors properly and place
them in the proper position so that the wires are not pinched
by other parts.
7. Removing the Under panel
(1) Remove the air intake grill.
(2) Remove the beam.
(3) Remove the side panel (right and left).
(4) Unscrew the screws of the under panel, then remove the
under panel.
w
Weight of the under panel : app. 2kg.
7. Removing the Indoor coil thermistor
(1) Remove the air intake grill.
(2) Remove the right side panel.
(3) Remove the relay connector of the pipe thermistor.
(4) Remove the screw, and remove the check panel.
(5) Extract the indoor coil thermistor from the holder.
<Caution for the installation>
There is a possibility for the short circuit when connector gets
wet by water through the thermistor lead wire.
Therefore, lead wire of the indoor coil thermistor should be
traped as shown in the photo 5.
Photo 4
Photo 5
Photo 6
Photo 7
Screw
Screw
Screw
Hold
Indoor coil thermistor
Trap
Check
panel
Relay connector of
the vane motor
Vane motor
Under panel
Relay connector of
the pipe thermistor
Left side
panel
Содержание PCH-2.5GKHA
Страница 2: ......