1-5. INSTALLATION DIAGRAM
Units should be installed by licensed contractor according to local code requirements.
ACCESSORIES
Check the following parts before installation.
(1) Drain socket
1
(2)
Drain cap
5
PARTS TO BE PROVIDED AT YOUR SITE
(A) Power supply cord*1
1
(B) Indoor/outdoor unit connecting wire*1
1
(C) Extension pipe
1
(D)
Wall hole cover
1
(E)
Piping tape
1
(F)
Extension drain hose
(or soft PVC hose, 15 mm inner diam-
eter or hard PVC pipe VP16)
1
(G)
Refrigeration oil
Little
amount
(H) Putty
1
(I) Pipe fixing band
2 to 7
(J) Fixing screw for (I)
2 to 7
(K)
Wall hole sleeve
1
(L)
Soft PVC hose, 15 mm inner diameter
or hard PVC pipe VP16 for drain
socket (1)
1
Note:
*1 Place indoor/outdoor unit connecting wire (B) and power
supply cord (A) at least 1 m away from the TV antenna
wire.
The “Q’ty” for (B) to (K) in the above table is quantity to be
used per indoor unit.
More than
100 mm
Open as a rule
More than 500 mm if
the front and both sides
are open
More than 100 mm
More than 200 mm if there are
obstacles to both sides
Open as a rule
More than 500 mm if the back,
both sides and top are open
More than 350 mm
Outdoor unit installation
Air inlet
Air outlet
Air inlet
950 mm
600 mm
175
mm
2-U-shape notched holes
(Base bolt M10)
330 mm
2 - 12 mm × 36 mm
oval holes (Base bolt M10)
370 mm
417 mm
1-6. DRAIN PIPING FOR OUTDOOR UNIT
1) Perform the drain piping work only when draining from one place.
2) Provide drain piping before indoor and outdoor piping connection.
3) Attach the drain socket to one of the several drain holes.
Fix the drain socket into the drain hole of the base using the catches to secure it in place.
4) Connect the soft PVC hose I.D.15 mm as shown in the illustration.
5) Make sure to provide drain piping with a downhill grade for easy drain flow.
6) Glue the drain caps to close all the other unnecessary holes with the glue (Prepare in the
field).
Note:
Apply the glue securely, as the glue (Prepare in the field) will work as seal to prevent water
from leaking.
Use the adhesive for the rubber and metal.
Attention
The outdoor unit is provided with several holes for drainage at the bottom to make drainage easier.
The drain socket is used to close the unnecessary holes and centralize the drainage when using
the drain tube at the installation place.
Do not to use the drain socket in cold region. The drain tube can be frozen.
(1) Drain socket
(2) Drain cap
(L) Soft PVC hose
*2 The manufacturing year and month is indicated on the spec name plate.
WARNING
To avoid risk of fire, embed or protect the refrigerant piping.
External damage on the refrigerant piping can be cause of fire.
When the piping is to be attached to
a wall containing metals (tin plated)
or metal netting, use a chemically
treated wooden piece 20 mm or
thicker between the wall and the pip-
ing or wrap 7 to 8 turns of insulation
vinyl tape around the piping.
To use existing piping, perform
COOL operation for 30 minutes
and pump down before removing
the old air conditioner. Remake flare
according to the dimension for new
refrigerant.
After the leak test, apply insulat-
ing material tightly so that there
is no gap.
WG79A798H02_01En.indd 6
2020/02/10 17:32:04
Содержание MXZ-4F83VF
Страница 172: ...A4_white_tombo indd 1 2018 08 09 14 11 29 ...
Страница 173: ...A4_white_tombo indd 1 2018 08 09 14 11 29 ...
Страница 174: ...A4_white_tombo indd 1 2018 08 09 14 11 29 ...