35
10-1. CHANGE IN DEFROST SETTING
<JS> When the JS wire of the inverter P.C. board is cut/ soldered, the defrost finish temperature is changed. (Refer to
11-6-1.)
MUZ-HJ25VA MUZ-HJ35VA MUZ-HJ50VA MUZ-HJ60VA MUZ-HJ71VA
10-2. PRE-HEAT CONTROL SETTING
PRE-HEAT CONTROL
When moisture gets into the refrigerant cycle, it may interfere the start-up of the compressor at low outside temperature.
The pre-heat control prevents this interference. The pre-heat control turns ON when the discharge temperature thermis-
tor is 20°C or below. When pre-heat control turns ON, compressor is energized. (About 50 W)
Pre-heat control setting
<JK>
ON: To activate the pre-heat control, cut the JK wire of the inverter P.C. board.
OFF: To deactivate the pre-heat control, solder the JK wire of the inverter P.C. board. (Refer to 11-6.1)
NOTE:
When the inverter P.C. board is replaced, check the jumper wires, and cut/solder them if necessary.
Jumper wire
Defrost fi nish temperature (
°C
)
MUZ-HJ25/35VA
MUZ-HJ50VA
MUZ-HJ60/71VA
JS
Soldered
(Initial setting)
8
10
None (Cut)
11
15
18
10
SERVICE FUNCTIONS
OBH648F
Содержание MSZ-HJ VA Series
Страница 12: ...12 MUZ HJ25VA E1 ER1 ET1 6 WIRING DIAGRAM MUZ HJ25VA E2 ER2 ET2 OBH648F ...
Страница 13: ...13 MUZ HJ35VA E1 ER1 ET1 MUZ HJ35VA E3 ER3 ET2 OBH648F ...
Страница 14: ...14 MUZ HJ50VA E1 ER1 ET1 MUZ HJ50VA E2 ER2 ET2 MUZ HJ60VA E2 MUZ HJ71VA E2 OBH648F ...
Страница 15: ...15 MUZ HJ60VA E1 ER1 ET1 MUZ HJ71VA E1 ER1 ET1 OBH648F ...
Страница 65: ...65 OBH648F ...