98
OPERATING PROCEDURE
PHOTOS
4. Removing the vane motor
(1) Remove the front panel.
(2) Remove the screws of the vane motor, disconnect the vane
motor connectors from the electronic control P.C. board.
(3) Disconnect the R.L. holder.
(4) Pull out the drain hose from the nozzle assembly, remove
the nozzle assembly.
(5) Remove the vane motors.
Photo 4
Photo 6
Drain hose
Vane motors
screws of the fan motor
Indoor coil
thermistor
Screw of the
electrical box
Photo 3
Screws of the
vane motor
Screws fix-
ing the left
side of the
heat
exchanger
3. Removing the electrical box
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical cover. (Refer to 2)
(3) Disconnect the connector of the indoor coil thermistor.
(4) Disconnect the motor connector (CN211 and CN121) and
the vane motor connector (CN151) on the electronic
control P.C. board.
(5) Remove the screw of ground wire.
(6) Remove the fan motor lead wire and indoor coil thermistor
from the electrical box.
(7) Remove the lead wire of vane motor from the bottom of
electrical box.
(8) Remove the screw fixing the electrical box, remove the
electrical box.
5. Removing the line flow fan and the indoor fan motor
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical box. (Refer to 3)
(3) Pull out the drain hose from the nozzle assembly, remove
the nozzle assembly.
(4) Remove the hexagon socket set screw from the line flow
fan.
(5) Remove the screws fixing the fan motor, remove the fan
motor.
(6) Remove the screws fixing the left side of the heat
exchanger.
(7) Lifting the left side of the heat exchanger.
(8) Remove the line flow fan.
Screw of the ground wire
Photo 7
Photo 5
OB245--4qxp 02.10.22 4:39 PM Page 98