Remove the one screw securing the connector box cover, and then open the cover.
Securely connect the junction wire connector of the vane motor and the panel vane
There are two vane motor connectors: one blue connector and one orange con-
nector. Make sure that the connector colors match when connecting them.
Close the connector box cover.
Connector box cover
Connector box
Securing screw
Junction connector
Band
-
corners of the panel and install them.
and signal receiver in the connector box.
as shown in the diagram so that there is no slack in the wires, and then cut off the
panel.
-
i-See sensor
Signal receiver
Fastener
i-See sensor
or signal
receiver