19
OCH659A
19
(Drainage)
When drain socket is installed
2
246
When drain socket is installed
233
When electrical box is pulled down
Electrical box
NOTES. 1.Use M10 or W3/8 screw for anchor bolt. 2.Please be sure when installing the drain pump (optional parts), refrigerant pipe will be only upward.
Electrical box
233
Air outlet
Air intake
9
6 7 8
5
1 2 3 4
Knockout hole for upper drain pipe arrangement Knockout hole for fresh air intake ø100 Knockout hole for wiring arrangement 2-ø22 Knockout hole for wiring arrangement 2-ø26
Drainage pipe connection(26mmI.D.) Drainage pipe connection(for the left arrangement) Knockout hole for left drain-piping arrangement Refrigerant-pipe connection(gas pipe side/flared connection) Refrigerant-pipe connection(liquid pipe side/flared connection)
1
In case of the rear pipe arrangement, make sure to remove the shaded portions from the independent piece. Then put the independent piece back in initial position. (The heat exchanger might be clogged because of dust)
5
10
51
246
(Drainage)
(gas
ø12.7
)
(liquid
ø6.35
)
150
62
140
18
917(Suspension bolt pitch)
320
680
80
84
88
195
230
57
254
476
680
182
85
878
8
48
260
24
38
85
86
2
126
169
121
190
18
38
120
°
960
2
2
853
124
76
46
190
75
387
461
3
8
Ceiling
5
1
4
7
184
203
ø125
6
9
37
138
2
[FRONT
VIEW
]
Accessory···Drain socket (I.D. 26)
(71)
236
PCA-M35KA PCA-M50KA
PCA-M35KA-ER PCA-M50KA-ER
Unit: mm
OUTLINES AND DIMENSIONS
6