5
Wall
Outdoor
side
2-2. HOLE DRILLING
1) Determine the wall hole position.
2) Drill a dia. 75 mm hole. The outdoor side should be 5 to 7 mm lower
than the indoor side.
3) Insert wall hole sleeve (J).
Unit suspension procedures
• Adjust the length of the bolt’s protrusion from the ceiling surface be-
forehand.
• Check the pitch of the suspension bolt (E). (308 mm × 1051 mm)
1) Install special washer (3) and their nuts (F) onto the suspension bolt
(E) in advance.
* Do this in the following order (from the top): nut (F), special washer
with cushion (3), special washer (3), nut (F), nut (G).
* Position special washer, with cushion (3) with the insulated surface
SRLQWLQJGRZQDVLQWKH¿JXUH
2) Lift the unit into place, aligned properly with suspension bolt (E).
Pass the bracket between special washer, with cushion (3) and
special washer (3), which are already in place, and secure it. Do the
same in all four places.
* Make sure the suspension bolt (E) extends 20 mm or more from
the surface of the ceiling. Otherwise you will not be able to install
the grille (optional).
*
,IWKHSRLQWVIRUVHFXULQJWKHJULOOHDUHQRWÀXVKZLWKWKHFHLO
-
ing surface, water may condense, or the panel may not open/
close.
3) If the long opening in the bracket and opening in the ceiling do not
align, adjust them until they do.
4) Check that the four corners are all level, using a spirit level or clear
plastic tubing with water in it.
* Water may drip from the unit if it is not installed horizontally.
5) Tighten all the nuts.
(a) Suspension bolt (E)
(b) Nut (G)
F 1XWZLWKÀDQJH)
(d) Special washer (with cushion) (3)
(e) Special washer (3)
(f) Install with insulation facing
down
(g) Suspension bolt (M10)
(h) Clear plastic tubing
(i) Underside of bracket
(j) Secure grille here
(a)
(j)
(c)
(d)
(e)*
(c)*
(b)
(k)
(f)
(g)
(h)
(j)
(j)
(i)
2-3. DRAIN PIPING
• Use drain pipe (B) for drain piping. Be sure to connect the piping
joints using adhesive of polyvinyl chloride family to prevent leakage.
• Before drain piping work, remove the pipe cover, hose band, pipe
band, and spacer (cushion). Dispose of the spacer (cushion), as it will
not be needed.
• Drain hose (2) is 540 mm long, so that drain piping exit can be moved
up. Cut drain hose (2) into appropriate length before connecting.
Hose band
Pipe band
Pipe cover
Indoor unit side
Cut within this area
Drain piping side
(Connect drain
pipe (B))
ø75 mm
5-7 mm
540 mm
430 mm
Ceiling surface
Make sure these surfaces
are flush with each other
(0-3 mm).
Places for securing grille
Drainage pan
20
mm
or
more
110
mm
110
mm
Make sure these surfaces
are flush with each other
(0-3 mm).
Spacer (cushion)
Содержание MLZ-KA25VA
Страница 10: ...10 ...
Страница 20: ...20 ...
Страница 30: ...30 ...
Страница 40: ...40 ...
Страница 50: ... ...
Страница 60: ...60 ...
Страница 70: ... ...
Страница 80: ...80 ...
Страница 90: ...90 ...
Страница 100: ...100 ...
Страница 110: ...110 ...
Страница 120: ... ...
Страница 121: ......
Страница 122: ......
Страница 123: ......