5
Operation
If you have followed the steps in the chapters 3 and 4, your modem is ready for operation.
5.1
MIM-G01
The MIM-G01 presents two LEDs, which indicate the devices current operating mode. After the
power supply has been switched on, a self test will be executed. The end of this test is indicated
by a acoustic signal (short beep). After the test, the device tries to make a connection to the GSM
network. The green LED will flash slowly when the log in was successful..
5.2
MIM-A01
The MIM-A01 presents five LEDs, which indicate the devices current operating mode. After the
power supply has been switched on, a self test will be executed. The end of this test is indicated
by a acoustic signal (short beep).
MIM-G01
Operation
5 - 1
MITSUBISHI ELECTRIC
COM1
(RS232)
-
+
DC 10...30V
Service
Power
Line
Mail in
Mail out Modem Mode
S
UPER MODEM
56k
COM1
(RS232)
-
+
DC 10...30V
Service
Line
Mail in
Mail out Modem Mode
S
UPER MODEM
56k
COM1
(RS232)
-
+
DC 10...30V
Service
Power
Line
Mail in
Mail out Modem Mode
COM1
(RS232)
-
+
DC 10...30V
Service
Line
Mail in
Mail out Modem Mode
Fig. 5-1:
LEDs on MIM-A01
Power
(yellow)
Mail in
(red)
Line
(green)
Mail out
(yellow)
Modem Mode
(red)
Starting self test
Testing LEDs
Flashes
Testing memory
Modem is fully operational
Duration: approx.
12 sec
Tab. 5-1:
LEDs during the self-test
Содержание MIM-A01
Страница 2: ......
Страница 4: ......
Страница 6: ...II MITSUBISHI ELECTRIC ...
Страница 8: ...IV MITSUBISHI ELECTRIC ...
Страница 61: ......