16
(1)The LM-AP is not completely
initialized.
(2)Setting on M-NET side is not properly
completed.
(3)If MELANS is used together LM-AP is
not registered to MELANS.
(4)The independent/combined
LOSSNAY of LM-AP is not set.
(4)L
ON
W
ORKS
®
network transmission
wire is not properly connected.
(5)The termination of L
ON
W
ORKS
®
network is not properly set.
(6) Binding of L
ON
W
ORKS
®
network is
not properly ended.
Refer to 1-(1).
Refer to 1-(2).
Refer to 1-(3).
Refer to 2-(4).
Refer to 4-(4).
Refer to 4-(5).
Refer to 4-(6).
Error content
Cause
Checking method and remedy
Independent/combi
ned LOSSNAY can
not be operated
from the LON side.
(1)The LM-AP is not completely
initialized.
(2)Setting on M-NET side is not properly
completed.
(3)If MELANS is used together LM-AP is
not registered to MELANS.
(4)L
ON
W
ORKS
®
network transmission
wire is not properly connected.
(5)The termination of L
ON
W
ORKS
®
network is not properly set.
(6) Binding of L
ON
W
ORKS
®
network is
not properly ended.
Refer to 1-(1).
Refer to 1-(2).
Refer to 1-(3).
Refer to 4-(4).
Refer to 4-(5).
Refer to 4-(6).
Air conditioner can
not be operated
from the LON side.
5
6
Содержание LMAP02
Страница 19: ......