8
3-3 Connection Methods
Use wire clamps provided to secure the wires and prevent external force from being conveyed by the wire to
the wire connections.
* External force could cause deformation or damage to the terminal blocks.
Use a small screwdriver to connect diameter 0.2 to 2.5 mm
2
(AWG24 to 12) cable for
terminal block (TB21) on the unit. Tightening torque is 0.5 to 0.6 Nm. Up to two wires can
be connected to one terminal block.
20mm
80mm
8mm
Binding band
For L
ON
W
ORKS
®
transmission wire
S
A
UP
B
S
R
P.B.
L.B.
4
LON TB21
3
1
CN405
CN65
CN45
CN32
CN21
CN71
CN31
CN33
CNS3
CN605
CNL12
CN702
TB21
2
Connect L
ON
W
ORKS
®
signal wire
to “1”, “2” or “3”, “4” of signal wire
terminal block (TB21).
• TB21-“1” and “3” as well as “2”
and “4” of TB21 are connected
inside the circuit board.
Connect the power supply
wires and ground wire to
“L”, “N” and ground of
terminal block (TB1).
Connect M-NET signal wire to “A”
and “B” of terminal block (TB2).
• Connect the M-NET
transmission wire to
transmission terminal block
(TB7) of the central control.
Attach the appended binding band to the power wire and transmission wire, and fasten it, positioning the
area at inner side than the wire clamp.
Make sure that the ground wire is longer than the other wires.
Note1
Binding band
Ground wire
Power wire 35mm
M-NET 20mm
For power wire and M-NET transmission wire
Note1
Note1
Note1