System Set Up
5
30
en
5.1.4 2-zone valve ON/OFF control
Opening /closing 2-way valve provides a simple 2-Zone control.
Flow temperature is common for Zone1 and 2.
1. Pipe work
2. DIP switch
Turn DIP switch 3-6 ON.
3. 2-way valve 2a (for Zone1) / 2-way valve 2b (for Zone2)
Electrically wire 2-way valve 2a and 2b to the appropriate exter-
nal output terminals. (Refer to "External outputs" in 5.1.2)
4. Room thermostat connection
1. Zone1 2-way valve 2a (local supply)
2. Zone2 2-way valve 2b (local supply)
3. Water circulation pump 2 (local supply) *1
4. By-pass valve (local supply) *2
*1 Install according to system in the field.
*2 For safety protection, it is recommended to
install a auto-operational (eg. mechanical spring
ie. not manual valve) by-pass valve.
Note:
Freeze stat function is deactivated whilst this con-
trol is ON. Use anti-freeze solution to avoid freez-
ing, if necessary.
4
3
1
2
Heating operation mode
Zone1
Zone2
Room temp. control
(Auto adaptation) *3
● Wireless remote controller (option)
● Room temperature thermistor (option)
● Main remote controller (remote position)
● Wireless remote controller (option)
Compensation curve or flow temp. control ● Wireless remote controller (option) *4
● Room temperature thermostat (local supply)
● Wireless remote controller (option) *4
●
Room temperature thermostat (local supply)
*3 Ensure to install the room thermostat for Zone1 in main room since the Room temp. control for Zone1 is prioritized.
*4 The wireless remote controller can be used as a thermostat.
Zone1
Zone2
N L
FTC
TBO.2
1 2 3
A
B
5.1.3 Wiring for 2-zone temperature control
Connect the pipe work and locally supplied parts according to
the relevant circuit diagram shown “Local system” in Section 3,
of this manual.
<Mixing valve>
Connect the signal line to open Port A (hot water inlet port) to
TBO. 2-3 (Open), the signal line to open Port B (cold water
inlet port) to TBO. 2-1 (Close) , and the neutral terminal wire
to TBO. 2-2 (N).
<Thermistor>
• Do not install the thermistors on the mixing tank.
•
Install the Zone2 flow temp. thermistor (THW8) near the mix
-
ing valve.
• The maximum length of the thermistor wiring is 30 m.
• The length of the optional thermistors are 5 m. If you need to
splice and extend the wirings, following points must be car-
ried out.
1) Connect the wirings by soldering.
2) Insulate each connecting point against dust and water.
Note:
Do not install the thermistors on the mixing tank. This
could affect correct monitoring of flow and return tempera
-
tures through each zone.
Install the Zone2 flow temp. thermistor (THW8) near the
mixing valve.
Close N Open
from mixing
tank
to mixing
tank
to Zone2
heat emitter
from Zone2
heat emitter
Motorized
mixing valve
RK79D203K01_01en.indd 30
2022/02/14 16:52:51
031