en
2. Air vent operation
[When an outdoor unit is connected, and refrigerant piping work, air-tightness test of refrigerant piping, evacuation of refrigerant
circuits, and refrigerant charging have been completed]
1. Turn on DIP SW002-3 of the Main-HBC.
2. The LED on the control board indicates "Air1," "Air2," "Air3," "Air 4," and "AirE" in order, and the pump will stop after a while.
6HHWKH¿JXUHEHORZIRUWKHDSSUR[LPDWHWLPHLWWDNHVWRFRPSOHWHDQDLUYHQWRSHUDWLRQ
LED position
DIP SW position
0
100
200
300
400
500
600
0
5
10
15
20
25
30
35
40
45
50
55
Control board
(LED, DIP SW positions)
Time required for air vent operation
3.
7XUQRႇ',36:
4. Close all manual air vent valves.
Stop the water supply.
[When no outdoor units are connected, or refrigerant piping work, air-tightness test of refrigerant piping, evacuation of refrigerant
circuits, and refrigerant charging have not been completed (when performing air vent operation for the water circuits only)]
The following must be completed before performing air vent operation.
• Assign M-NET addresses to the HBC and the indoor units.
•
+DYHDFRPSXWHUUHDG\ZLWKWKH01FRQYHUWHUDQGWKH0DLQWHQDQFH7RRO9HURUODWHULQVWDOOHG
•
+DYHDSRZHUVXSSO\GHYLFH3$&6&.8$UHDG\
* While the air vent operation is being performed, no other functions of the Maintenance Tool are available for use.
1. Follow the procedures below after connecting the MN converter and starting up the Maintenance Tool. (Manuals are accessible from the
Maintenance Tool.)
<Air vent operation procedure (without connection to an outdoor unit)>
2SWLRQĺ
&RPPLVVLRQLQJVXSSRUWĺ
+95)5FRPPLVVLRQLQJ
1
6HOHFW2SWLRQĺ&RPPLVVLRQLQJV95)5
commissioning.
2
$FRQ¿UPDWLRQZLQGRZZLOODSSHDU&KHFNWKHPHVVDJHDQGSUHVV
Next to proceed.
*
0DQXDOVDUHDFFHVVLEOHIURPWKHFRQ¿UPDWLRQZLQGRZ
3
After the units are searched for, a sign that indicates the completion
of preparation will appear. Turn on DIP SW002-3 of the Main-HBC to
start the operation.
Maintenance Tool window
(Air vent operation without connection to an outdoor unit)
2. The LED on the control board will indicate "Air1," "Air2," "Air3" and "AirE" in order, and the pump will stop after a while.
The progress of the air vent operation will appear on the service LED of the Main-HBC and on the Maintenance Tool.
3.
6WRSWKHZDWHUVXSSO\DQGFKHFNWKDWQRZDWHULVFRPLQJRXWRIWKHPDQXDODLUYHQWYDOYHV7KHQWXUQRႇ',36:
4. Close all manual air vent valves.
Stop the water supply.
* Before setting the DIP SW, make sure that the service LED of the Main-HBC is not indicating any error.
* Debris removal operation or air vent operation cannot be executed from the Maintenance Tool.
* An air vent operation using warm water cannot be performed to remove dissolved oxygen (Air4) from the water circuit without connection to an
outdoor unit.
After connecting the outdoor unit (refrigerant circuit), perform an air vent operation again to remove all air from the circuit.
Any air left in the water circuit may damage the pump.
(Air4 operation alone can be performed by turning on DIP SW001-10 after connecting the outdoor unit (refrigerant circuit).)
Total number of branch
To
ta
l t
im
e
[
m
in
]
Total estimated time for air vent operation
STEP4 included
STEP4 not included