3.2 TRANSPORTATION AND INSTALLATION
Table 8
How to Transport and Install the System
Transportation
Installation
Transport unit with a forklift.
Pull out the UPS cabinet as shown in Figure 32.
Fix the UPS unit in place using the four (4) leveling feet.
Using the two (2) brackets (with pre-drilled hole (0.47"
diameter)), anchor the UPS using the appropriate
hardware (not provided).
NOTE: Do not transport in a horizontal position. Cabinets should be
maintained upright /- 15
°
of the vertical during handling.