Installation
185
In
st
allatio
n
Adding a Peripheral Cabinet
1. Install the peripheral cabinet (including Bay Power Supply, Bay
Control Card, and required Fiber or Copper Interface Module).
2. Connect the fiber or copper cable to the interface module in the
control cabinet.
3. Power up the cabinet.
4. Enter CDE mode on the maintenance terminal.
5. Select Form 01, System Configuration and configure the new cards
(select node type as required).
6. Complete remaining CDE for the new cards.
Refer to
Powering Up the Nodes (page 59).
Make sure there are enough devices available
(CDE Form 04, Option 103).
Содержание SX-200 EL
Страница 1: ...TECHNICIAN S HANDBOOK LIGHTWARE 19 RELEASE 3 0 ...
Страница 11: ...Chapter 1 Introduction ...
Страница 12: ......
Страница 32: ...Technician s Handbook 22 ...
Страница 33: ...Chapter 2 Routine Maintenance ...
Страница 34: ......
Страница 55: ...Chapter 3 Troubleshooting and Repair ...
Страница 56: ...Technician s Handbook 46 ...
Страница 88: ...Technician s Handbook 78 Figure 16 E M Trunk Type I 2 wire ...
Страница 110: ...Technician s Handbook 100 ...
Страница 111: ...Chapter 4 Programming ...
Страница 112: ......
Страница 168: ...Technician s Handbook 158 ...
Страница 169: ...Chapter 5 Installation ...
Страница 170: ......
Страница 175: ...Installation 165 Installation SX 200 ML FD Cabinet Card Assignment Figure 24 SX 200 ML FD Cabinet Card Assignment ...
Страница 176: ...Technician s Handbook 166 SX 200 LIGHT Cabinet Card Assignment Figure 25 SX 200 LIGHT Cabinet Card Assignment ...
Страница 239: ...Chapter 6 Maintenance Commands ...
Страница 240: ......
Страница 258: ...Technician s Handbook 248 ...
Страница 261: ...Notes ...
Страница 262: ...Technician s Handbook Notes ...