Planning and Site Survey
17
using an audio connection to ensure that the quality is sufficient. Handovers are still possible in
this area.
Next, move to the spot where you want to install the first base station with the two DECT phones
and the base station. Secure the test base station provisionally to the spot in question (e.g. by
positioning the tripod with the base station in that spot). While observing the display and the
signal on the DECT phone, walk around the circumscribed area of the transmitter with the DECT
phones until the limit value is shown on the display. Enter these points on your floor plan.
TDM-BASE STATIONS
The selected limit value should be measured at these points.
If uninterrupted telephony is to be guaranteed, the next transmitters must also be visible with
–70 dBm at these –70 dBm points shown by the previous transmitter. Next, walk around the
entire radio hop, determine the corresponding locations of the transmitters, and enter them in
your plan.
IP-BASE STATIONS
As the DECT base stations synchronise among themselves, it is imperative that they are in sight
of one another,(i.e., a base station must not be positioned further away than a maximum of
Содержание SIP-DECT Site Survey Kit
Страница 1: ...SIP DECT Site Survey Kit USER GUIDE...
Страница 5: ...USING THE SIP DECT SITE SURVEY KIT...
Страница 6: ...SIP DECT Site Survey Kit User Guide 2...
Страница 29: ...Appendix A TECHNICAL DATA...