SIP-DECT Site Survey Kit User Guide

12

PLANNING AND SITE SURVEY

The planing procedure is described below.

1.

Ascertain customer requirements.

2.

Roughly determine the locations for the base stations.

3.

Measure out the DECT system on site.

4.

Install and re-measure the system.

ASCERTAINING CUSTOMER REQUIREMENTS

Since the aim of DECT systems is to cover all kinds of different mobility requirements in a 
non-standardized environment, you need to determine and record precisely what sort of 
requirements the customer has in mind. Records avoid misunderstandings and can be used as 
a working paper (e.g. project progress report) or as specifications to be confirmed by the customer.

Important questions:

Situation: Where are the calls to be made from – outdoors/indoors?

Premises: What surface area and what height or depth (stores, basement floors) form part 
of the supply range? Recommendation: Request building plan or make a sketch.

Building structure: What sort of materials and types of construction are the buildings made 
of? What sort of structural changes are planned for the near future?

Subscribers: How many DECT phones are required? What sort of calling patterns do users 
have?

Traffic density: How are the DECT phones distributed throughout the premises and which 
users are where? (Specify areas with a high traffic density.)

Dynamics: How many DECT phones are expected where and at what times of the day? 
Recommendation: Take account of special infrastructure areas such as cafeteria 
9:00…10:00, meeting rooms, open-plan office.

INITIAL DETERMINATION OF BASE STATION LOCATIONS

Radio circumstances are difficult to estimate. For this reason, situations regarded as particularly 
critical need to be determined on site through measurements.

This will provide a reliable idea of the equipment required and the locations for the base stations. 
The following rules of thumb may be of help:

Good connections are still possible in a horizontal direction behind two or three ordinary brick 
walls; but there is barely any penetration through concrete floors and ceilings in a vertical 
direction and in ground floor or basement floors (i.e., each store must be supplied separately). 
A certain amount of vertical penetration can be expected from the first floor upwards; generally 
speaking, radio propagation conditions improve as the distance from the ground increases.

Openings in obstacles improve radio conditions.

Subsequent furnishing: In empty buildings, the effect of the absence of furniture, machines, 
partitions, etc., and their room limitation must be taken into account. Subsequent extensions 
and conversions also have a considerable influence.

Содержание SIP-DECT Site Survey Kit

Страница 1: ...SIP DECT Site Survey Kit USER GUIDE...

Страница 2: ...ocument or new editions of it may be issued to incorporate such changes No part of this document can be reproduced or transmitted in any form or by any means electronic or mechanical for any purpose w...

Страница 3: ...ll State 9 Audio Quality Measurements 10 Handover Menu 11 Planning and Site Survey 12 Ascertaining Customer Requirements 12 Initial Determination of Base Station Locations 12 Optimum Positioning of th...

Страница 4: ...SIP DECT Site Survey Kit User Guide iv Interference Factors 21 Reception Conditions 23 Using External Antennas 23 Fading Effect 24 APPENDIX A TECHNICAL DATA Technical specifications 26...

Страница 5: ...USING THE SIP DECT SITE SURVEY KIT...

Страница 6: ...SIP DECT Site Survey Kit User Guide 2...

Страница 7: ...DECT phones when activated Always observe the rules and regulations of the establishment concerned when using portable phones within medical facilities Never open the equipment itself touch the plug i...

Страница 8: ...SIP DECT SITE SURVEY KIT SIP DECT SITE SURVEY KIT CONTENTS SIP DECT Site Survey Kit Upper Layer SIP DECT Site Survey Kit Lower Layer The Tripod bag includes the tripod light stand with Powerpack brac...

Страница 9: ...2 Attach the Powerpack in bracket 3 Connect the PoE cable to the Powerpack use the standard RJ45 connector 4 Screw the DECT base station mounting plate on the tripod 5 Attach RFP SI with Status LED s...

Страница 10: ...with BNC connector 3 Connect the antenna cables to the DECT base station The DECT phone shows the standard measurement mode display with RFP Number RPN and field strength dBm Troubleshooting during St...

Страница 11: ...el 650c in the charger Wait until the Mitel 650c is fully charged Ensure that the Mitel 650c is switched off before placing it in the carrying case CHARGING THE IPOD The iPod can be charged with the L...

Страница 12: ...AND SOFTKEYS Standard display in idle state XQ mode This key toggles the XQ to OFF ON Default is ON and XQ is controlled by the DECT base statoin DECT measure mode All visible DECT base stations from...

Страница 13: ...can be changed manually In an active call between the measurement DECT phones you see the following Site survey On Off DECT XQ mode On Off Automatic handover On Off Line in On Off default Off headset...

Страница 14: ...ite 1 Define the first Mitel 650c as audio source 2 Toggle Line in ON in the Service menu 3 Connect the music player iPod via the audio cable 4 Toggle Line in OFF in the service menu of the second Mit...

Страница 15: ...the SIP DECT Site Survey Kit Handover menu in active call state Initiate Handover to by a long press on the star key only in call Toggle automatic handover On Off function by a long press on the hash...

Страница 16: ...nes distributed throughout the premises and which users are where Specify areas with a high traffic density Dynamics How many DECT phones are expected where and at what times of the day Recommendation...

Страница 17: ...dea of the equipment required and the locations for the base stations Co operation with the customer As soon as you are able to make sufficiently binding statements about problem areas you should invo...

Страница 18: ...base station Make sure the installation site is at a sufficient height to be protected from acts of vandalism DECT BASE STATION FOR INDOOR SUPPLY Observe the following principles when installing DECT...

Страница 19: ...ASE STATION SYNCHRONIZATION TDM and IP Base stations To guarantee a seamless handover the base stations should be fitted in such a way that the 60dBm overlap area is guaranteed When conducting survey...

Страница 20: ...eous connections are possible which require for example four base stations Thus approximately 60 DECT phones can be used in a hotspot with high traffic volume simultaneous call connections of approxim...

Страница 21: ...f the transmitter with the DECT phones until the limit value is shown on the display Enter these points on your floor plan TDM BASE STATIONS The selected limit value should be measured at these points...

Страница 22: ...ry the components must be positioned at a distance of at least 30 cm from the base station Likewise other metallic objects should be positioned as far away from the base station as possible Limit valu...

Страница 23: ...also customer satisfaction For new projects in particular the following considerations must be taken into account Radio coverage area capacity in terms of the number of connections traffic density Kno...

Страница 24: ...upply ranges for these independent DECT radio systems can also overlap In this case an automatic system search is not possible RADIO CHARACTERISTIC OF A BASE STATION The coverage range of a base stati...

Страница 25: ...n HIGH FREQUENCY PROPAGATION CONDITIONS For a better understanding of the explanations on physical conditions given in the following sections we first need to take a look at the basic principles of hi...

Страница 26: ...s and is therefore difficult to assess Metal paneled rooms and large metal clad objects such as air conditioners computer rooms and metallized glassed areas mirrored fire protection walls storage tank...

Страница 27: ...s are useful for rectifying radio signals thereby achieving a greater range in one particular direction e g to provide coverage to remote ancillary buildings providing coverage to an outside area with...

Страница 28: ...ancelling one another out through reflections and considerably improves the connection quality If such an effect occurs on one of the antennas the base station automatically switches over to the secon...

Страница 29: ...Appendix A TECHNICAL DATA...

Страница 30: ...ime division mulitplex 10 ms frame length Time division mulitplex 10 ms frame length Channel subdivision 1728 kHz 1728 kHz Number of carrier frequencies 5 10 Number of time slots 24 24 Number of chann...

Страница 31: ...ks Corporation All Rights Reserved The Mitel word and logo are trademarks of Mitel Networks Corporation Any reference to third party trademarks are for reference only and Mitel makes no representation...

Отзывы: