TROUBLESHOOTING
5
CAP 06/17-A
Bathtub Installation
1. PLUMBING
Install all plumbing and drainage before securing the unit. It is always recommended to have a competent,
professional plumber to do the plumbing installations. Before drilling a hole in the floor for the drainpipe, make sure
there are no hidden elements underneath (pipes, floor joists, heating ducts, electrical wires, etch).
2. LEVELING
Once the unit is in position, ensure its level is adjusted in both directions for proper draining. Leveling must be done with
the adjustable feet located beneath the unit. Adjust the feet so that they are ¼" [6 mm] above the bottom rim of the bathtub.
The bathtub’s weight should be supported by the feet, not the rim.
4X
3. OBLIGATORY TEST
The bathtub must be tested before installation is completed. Fill the tub to the overflow and inspect it for leaks. Tighten any
loose connections.
4. APPLY A SILICONE SEAL UNDERNEATH THE BATHTUB.
HEURES
HOURS