background image

3

CAP 06/17-A

Before Beginning

• Carefully read the instructions before beginning the installation.
• Observe all local plumbing and building codes.
• To protect the unit during installation, we recommend that you lay a piece of cardboard underneath the bathtub.
• Place the unit in the bathroom before you start working. If the unit is covered with a polyethylene protective film, do not
   remove it until the installation is complete for maximum protection. However, remove film where two surfaces will be in
   permanent contact.
• It is strongly recommended that this installation be performed by a professional plumber or contractor.
• A minimum of two people are needed to perform this installation.
• Provide a minimum of 1800 lb (816.5 kg) floor support under the bathtub.
• The bathtub is designed for a freestanding installation only.

Recommended Tools and Material

•  Silicone sealant
•  Tape measure
•  Pencil
•  Safety glasses

•  Pipe wrench
•  Level
•  Conventional woodworking          

tools and materials 

•  Drop cloth
•  2x4’s
•  Mortar
•  Optional: construction adhesive

Inspection and Testing

Inspection:

• Remove the bath from the carton. Retain the shipping carton until satisfactory inspection of the product has been made. Do not lift the bath
   by the plumbing at any time; handle by the shell only. All bath units are factory tested for proper operation and watertight connections
   prior to shipping.
• Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage to any
   components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excluded from the warranty.
• Inspect the tub components for loose fittings.

Testing:

• Prior to installation and before enclosing with wallboard, tile, etc., the bath must be filled with water and operated to check for leaks that
   may have resulted from shipping damage or mishandling.
• It is the responsibility of the installer to thoroughly test the tub prior to completing installation. Place the tub on a level surface, ensure
   drain is sealed and fill the bathtub with water to the bottom of the overflow. Allow water to sit in tub for at least 5 minutes as a static test. If
   installing a system tub, plug in the motor/ pump and turn it on. Confirm all features function correctly. Visually inspect all joints for leaks.
   DO NOT install tub if any leaks are detected or system functions do not work properly.

DO NOT SIT ON THE LEDGE OF THE BATHTUB

That might cause serious injury. FLEURCO is not responsible for defects and/or
problems incurred under these circumstances

Содержание MNO series

Страница 1: ...E INSTALLED BYA LICENSED TRADESMAN LICENSED PLUMBERS AND ELECTRICIANS SHOULD BE EMPLOYED TO INSURE PROPER INSTALLATION INSTALLERS ASSUME ALL LIABILITY FOR THE CORRECT INSTALLATION PROCEDURES Only accessories authorized by the manufacturer should be used with this product This product is designed for residential use and use by healthy individuals IMPORTANT SAFETY INSTRUCTIONS WARNING WHEN USING THI...

Страница 2: ... IMPORTANT SAFETY INSTRUCTIONS INSTRUCTIONS PERTAINING TO A RISK OF FIRE ELECTRIC SHOCK OR INJURY TO PERSONS READ AND FOLLOW ALL INSTRUCTIONS Risk of personal injury Do not permit children to use this unit without adult supervision WARNING Risk of personal injury Do not operate this unit without the guard over the suction fitting WARNING Risk of hyperthermia and possible drowning People using medi...

Страница 3: ...e Do not lift the bath by the plumbing at any time handle by the shell only All bath units are factory tested for proper operation and watertight connections prior to shipping Inspect the shell and bathtub components Should inspection reveal any damage or defect in the finish or visible damage to any components do not install the bathtub Damage or defect to the finish claimed after the bathtub is ...

Страница 4: ...Ferguson Enterprises Inc 253537 CAP 06 17 A COMPONENT IDENTIFICATION 4X 1X Built in overflor drainage channel Part Qty 1 Bathtub 1 2 Overflow 1 3 Drain 1 4 Hex Locknut 8 5 Adjustable Feet 4 6 Adjustable Feet Cap 4 7 Adjustable Thread 4 ...

Страница 5: ...ctrical wires etch 2 LEVELING Once the unit is in position ensure its level is adjusted in both directions for proper draining Leveling must be done with the adjustable feet located beneath the unit Adjust the feet so that they are 6 mm above the bottom rim of the bathtub The bathtub s weight should be supported by the feet not the rim 4X 3 OBLIGATORY TEST The bathtub must be tested before install...

Страница 6: ...gentle liquid detergent For acrylic surfaces occasional use of a special acrylic surface cleaner will add luster and protect the finish Do not use abrasive cleaners scrapers metal brushes or any items or products that could scratch or dull the surface Paint stains Use either turpentine or a paint thinner Silicone Use a plastic or wood spatula covered with a damp cloth only If a rubber mat is used ...

Отзывы: