NV8256-Plus Digital Video Router • User’s Guide
49
3. Installation
Verification
Verification
When installation is complete, perform the following checks to make sure the router is operating
properly:
• On the NV6257 power supply, check that all 5 green power LEDs on the front of each PS6000
power supply module are lit. If any or all LEDs are off:
Check that the PS6000 power supply module is fully seated in its slot.
Check the AC fuse on the PS6000 power supply module.
Check for +48 volts at each of the 5 front test points.
• On the NV8256-Plus, check that the LEDs on the input cards, crosspoint cards, control cards,
and output cards are lit and indicating a “healthy” system. See
list of normal and alert LED states.
• Make sure that the flow of air through the front of the router is unimpeded and the door is prop-
erly installed and closed. For more information, see
on page 59.
Содержание NV8256-Plus
Страница 10: ...x Rev 1 3 29 Mar 09 Table of Contents ...
Страница 60: ...50 Rev 1 3 29 Mar 09 3 Installation Verification ...
Страница 66: ...56 Rev 1 3 29 Mar 09 5 Configuration UniConfig ...
Страница 72: ...62 Rev 1 3 29 Mar 09 6 Maintenance Obtaining Service ...
Страница 82: ...72 Rev 1 3 29 Mar 09 9 Part Numbers Frame Expansion ...
Страница 88: ...78 Rev 1 3 29 Mar 09 Index ...