NV8256-Plus Digital Video Router • User’s Guide
23
3. Installation
Chapter 3 provides installation and connection instructions. It presents the following topics:
•
•
•
•
•
•
•
Making Router Control System Connections
•
•
Making Video Reference Connections
•
•
•
Summary
When setting up the NV8256-Plus for the first time, or reconfiguring an existing router configura-
tion, there are certain steps that must be performed. It is recommended that initial installation and
later reconfiguration tasks be performed in a specific order to avoid possible complications.
Perform installation and reconfiguration tasks in the following order:
1 Mount the router in a rack. If reconfiguring, skip this step if the router is already rack mounted
and not being remounted. See
2 Connect power, being sure to install PS6000 modules
after
power is connected. See
3 Install active cards in the appropriate front card slots. If reconfiguring, remove cards and rein-
stall in the newly desired slots. Make sure that the appropriate backplane is installed for each
active card. See
4 Make connections between the source of incoming signals and the destination of outgoing sig-
nals, and the router. If reconfiguring, change signal connections to match new backplane and
active card configuration. See
5 Make connections between the router and the router control system. If reconfiguring, skip this
step if all necessary router control system connections are still adequate. See
Содержание NV8256-Plus
Страница 10: ...x Rev 1 3 29 Mar 09 Table of Contents ...
Страница 60: ...50 Rev 1 3 29 Mar 09 3 Installation Verification ...
Страница 66: ...56 Rev 1 3 29 Mar 09 5 Configuration UniConfig ...
Страница 72: ...62 Rev 1 3 29 Mar 09 6 Maintenance Obtaining Service ...
Страница 82: ...72 Rev 1 3 29 Mar 09 9 Part Numbers Frame Expansion ...
Страница 88: ...78 Rev 1 3 29 Mar 09 Index ...