16
1.8
Thoroughly fl ush the mains-fed cold
water supply pipe. The water supply
pipework must be clean and free from
debris before connecting to the Mira
Advance ATL.
Note!
Pipework debris will reduce the
performance of the unit.
To
fl ush the pipework, turn on the
water supply and drain a minimum
of 10 litres (2 gallons) of water into a
bucket or catchment area. Turn off the
water supply.
1.9
Avoiding buried cables and pipes,
choose one of the upper fi xing holes
which will allow the Mira Advance ATL
to be fi rmly fi xed to the wall structure,
and drill through the thinned hole
section in the back of the case.
1.10
Unscrew the transit sealing caps
from the inlet and outlet of the Mira
Advance ATL.
Note!
A small amount of water may
be released.
1.11
Offer the Mira Advance ATL up to
the wall and temporarily connect the
mains-fed cold water supply pipe.
Mark through the casing the position
of the upper and lower holes. Remove
the Mira Advance ATL from the wall
before drilling. This will prevent debris
from entering the Mira Advance ATL.
1.12
Drill and suitably plug the two fi xing
holes. Route the Signal Cable to
the Terminal Block located on the
Transformer Cable of the Shower
Drain Pump (Standard Extra and Flex
Extra models only).
Upper Fixing Holes
Lower Fixing Holes
Do not connect
Signal Cable to mains
Electricity Supply!
(Standard Extra and Flex Extra
models only)
Содержание SDP044T
Страница 41: ...41 NOTES...
Страница 44: ...44 CUSTOMER SERVICE 1062889 W2 B 1566 J87A R Kohler Mira Limited November UKAS...