17
Template
Wall plugs
Cold Supply
Hot Supply
2. Rising or Falling Supplies
2.1
Remove the Elbow Shrouds from the
Shower Control.
2.2 Rising Supplies:
Loosen the
Grubscrew on each Elbow using
the 2.5 mm hexagon key (supplied)
and pull off the Elbows from the
Shower Control. Refit each Elbow
on the opposite side and rotate
90° as required. Retighten the
Grubscrews.
Caution!
Do not overtighten.
Falling Supplies:
Loosen the
Grubscrew on each Elbow using the
2.5 mm hexagon key (supplied) and
rotate the Elbows 90° as required.
Retighten the Grubscrews.
Caution!
Do not overtighten.
2.3
Use the Installation Template to mark
the positions of the fixing holes for the
Backplate.
Note!
Allow a minimum of 150 mm
either side of the Shower Control,
to allow the hot and cold inlet
Compression Nuts to be tightened
with the Spanner supplied.
2.4
For solid walls drill the Backplate
holes with a 6 mm drill and fit the Wall
Plugs (supplied). For other types of
wall structure alternative fixings (not
supplied) may be required.
2.5
Fit the supply pipework, centres set
35 mm from the finished wall surface
(Hot - Left, Cold - Right).
Note!
If the connections are reversed,
complete the installation then refer to
section:
‘Reversed Inlet Supplies’
before commissioning.
2.6
Loosen the Grubscrew and remove
the Backplate from the Shower
Control.
Содержание DISCOVERY
Страница 42: ...42 NOTES ...
Страница 43: ...43 NOTES ...