2. Commissioning
MiR1000 Quick start (en) 06/2020 - v.1.2 ©Copyright 2019-2020: Mobile Industrial Robots A/S.
10
2. Commissioning
This section describes how to get started with MiR1000.
2.1 Powering up
Follow these steps to power up MiR1000.
1.
Open the rear maintenance hatch. To open the hatch, push two buttons on the hatch and
pull the hatch.
2.
Turn the battery disconnect switch to position
ON
.
3.
The
On/Off
button turns blue.
See
MiR1000 control panel on page 18
.
4.
Close the maintenance hatch.