![Minelab F3 COMPACT Metal Mine Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/minelab/f3-compact-metal-mine/f3-compact-metal-mine_service-manual_1801268040.webp)
F3 COMPACT Service Manual
_______________________________________________________________________________________________________________________
40
•
Fit the cover shaft hinge to the shaft and screw into place.
•
Slide the coil into the end of the lower shaft. Fit the cap shaft then fit the two screws
(14mm Nylon).
•
Thread the coil cable through the detector hinge and fit the shaft onto the detector
hinge.
•
Connect the coil connector and close the detector body described in Section
3.2 - Closing
the Detector Body
.
Figure 68: Fitting Coil to Lower Shaft
Figure 69: Fitting Shaft and Coil
Figure 70: Connecting Coil Cable and Cover
Coil Connector Nut