If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 1-800-533-1806.
Mincey Marble Mfg., Inc.
|
4321 Browns Bridge Road, Gainesville, GA
|
800.533.1806
|
www.minceymarble.com
7
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
$IWHU\RXKDYHLQVWDOOHGWKH%DFN*ODVV3DQHODQGDGMXVWHGWKH5ROOHUVVRWKDWWKH*ODVV3DQHOFORVHVÀXVKWRWKH
Wall Channel Bumpers, you are ready to install the two RETENTION PIECES to the Back Glass Panels. Use the
two 1/8” Allen Wrenches to adjust the height of the RETENTION PIECES, much in the same way the Rollers are
adjusted. Then, use both 1/8” Allen Wrenches to securely tighten the RETENTION PIECES in place.
It is ideal to leave enough space between the RETENTION PIECES and the GUIDE RAIL to slide a Credit Card or a
Key Card in-between, to ensure secure, ease of motion.
RAISE OR LOWER
RETENTION PIECE TO
DESIRED HEIGHT
HOLD FIRMLY
AND TIGHTEN
USING BOTH
1/8” ALLEN
WRENCHES
Install the TOWEL BARS in the pre-cut holes in the GLASS PANELS.
The Inside Door, closed to the wall with the Shower Head, will have
the Towel Bar on the Inside. The FINGER PULLS will be installed on
the Outside Edges of the bars.
THANK YOU FOR USING OUR MINCEY MARBLE PRODUCT! WE APPRECIATE YOUR BUSINESS!
RUN A BEAD OF 100%
SILICONE ON THE
INSIDE AND OUTSIDE
OF THE VERTICAL
WALL CHANNELS AND
WATER GUARD, ALLOW
24 HOURS BEFORE
EXPOSING TO ANY
MOISTURE
CAM LOBE UP = PIECE DOWN
CAM LOBE DOWN = PIECE UP
RAISE RETENTION
PIECES TO WHERE A
CREDIT CARD OR A
KEY CARD WILL SLIDE
BETWEEN THE RETEN-
TION PIECE AND THE
GUIDE RAIL,
ALLOWING FOR
SECURE, SMOOTH,
GLIDING OPERATION
OF THE GLASS PANELS
You are now ready to install the FRONT GLASS PANEL. Carefully align the bottom of the GLASS PANEL into the
CENTER DOOR GUIDE located on the WATER GUARD as you hang the ROLLERS onto the GUIDE RAIL. Next,
follow the same instructions as the Back Glass Panel and adjust the height of the Glass Panel with the Rollers to
the desired position and install the Retention Pieces. Then, you can proceed to installing the TOWEL BARS.
Lastly, apply a bead of 100% SILICONE on the INSIDE where the
Water Guard meets the Pan and where the Wall Channels meet the
Panels. Repeat the same process for the OUTSIDE of the Wall
Channels and the Water Guard.
Must allow the Silicone to dry
for 24 hours before any exposure to water or moisture.
USE 3/32” ALLEN
WRENCH TO
TURN
FINGER PULLS
(Qty: 2)
BAR ENDS
(Qty: 2)
ACRYLIC WASHERS
INCLUDED: 7/16” (Qty: 4)
1” (Qty: 8)
THIS IS NOT
A SET SCREW,
USE ALLEN
WRENCH TO
ROTATE
TOWEL BAR
END UNTIL
ADEQUATELY
TIGHT
ADD LOCTITE BLUE
243 TO SCREWS
FINGER PULLS INSTALL
TO THE OUTSIDE
HANG
FRONT
GLASS
PANEL,
ADJUST
HEIGHT,
INSTALL
PIECES
SHOWER
FRONT
NOTE: LOCTITE BLUE 243 is required as a
threadlocker to secure the installation of the
Retention Piece Screws. LOCTITE is NOT
provided with the doors, but is readily available at
many hardware stores, online at mscdirect.com or
through Mincey Marble at 1-800-533-1806.