If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 1-800-533-1806.
Mincey Marble Mfg., Inc.
|
4321 Browns Bridge Road, Gainesville, GA
|
800.533.1806
|
www.minceymarble.com
AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)
5
Now you are ready to install the BUMPERS in the Vertical Wall Channels.
There are four to each side; two at the top and two at the bottom,
secured with a single, center 7/16” Screw and Screw Cap.
Install all of the ROLLERS into the Upper Holes
in the GLASS PANELS with the CAM LOBE in
the DOWN position, this will place the
GLASS PANELS in the DOWN position
as a baseline for starting the
panel adjustments.
ADJUSTMENT
CAM LOBE
FELT WASHERS
GLASS PANEL
CAM LOBE UP = GLASS UP
CAM LOBE DOWN = GLASS DOWN
You are now ready to install the GUIDE RAIL.
Before you install the GUIDE RAIL, it is
recommended to place one of the GLASS
PANELS inside the Shower with the ROLLERS
facing outward. This will make it easier to
install the Back Glass Panel after the
GUIDE RAIL has been installed. Be
sure to protect the bottom of the
GLASS PANEL and the Shower Pan.
Next you will prepare to install the GLASS PANELS. Start by disassembling
the ROLLERS and installing them onto the GLASS PANELS.
1/8” ALLEN
WRENCH
3/16” ALLEN
WRENCH
USE ONE OF THE 1/8”
ALLEN WRENCHES TO
HOLD THE END WHEEL
ON THE ROLLER WHILE
YOU LOOSEN THE END
SCREW WITH THE 3/16”
ALLEN WRENCH
NOTE: LOCTITE BLUE 243 is required
as a threadlocker to secure the
installation of the Roller Screws.
LOCTITE is NOT provided with the doors,
but is readily available at many hardware
stores, online at mscdirect.com or through
Mincey Marble at 1-800-533-1806.