background image

If you have any questions, please call MINCEY MARBLE CUSTOMER SERVICE at 1-800-533-1806.

  Mincey Marble Mfg., Inc.  

|

  4321 Browns Bridge Road,  Gainesville, GA  

|

  800.533.1806  

|

  www.minceymarble.com

 

AREZZO BYPASS BARN DOOR ENCLOSURE SYSTEM INSTALLATION (cont.)

5

Now you are ready to install the BUMPERS in the Vertical Wall Channels.  

There are four to each side; two at the top and two at the bottom,  

secured with a single, center 7/16” Screw and Screw Cap.

Install all of the ROLLERS into the Upper Holes 

in the GLASS PANELS with the CAM LOBE in 

the DOWN position, this will place the 

GLASS PANELS in the DOWN position 

as a baseline for starting the 

panel adjustments.

ADJUSTMENT  

CAM LOBE

FELT WASHERS

GLASS PANEL

CAM LOBE UP = GLASS UP

CAM LOBE DOWN = GLASS DOWN

You are now ready to install the GUIDE RAIL.  

Before you install the GUIDE RAIL, it is  

recommended to place one of the GLASS 

PANELS inside the Shower with the ROLLERS 

facing outward.  This will make it easier to 

install the Back Glass Panel after the 

GUIDE RAIL has been installed.  Be 

sure to protect the bottom of the 

GLASS PANEL and the Shower Pan.

Next you will prepare to install the GLASS PANELS.  Start by disassembling 

the ROLLERS and installing them onto the GLASS PANELS.

1/8” ALLEN 

WRENCH

3/16” ALLEN 

WRENCH

USE ONE OF THE 1/8” 
ALLEN WRENCHES TO 
HOLD THE END WHEEL 
ON THE ROLLER WHILE 
YOU LOOSEN THE END 
SCREW WITH THE 3/16” 
ALLEN WRENCH

NOTE: LOCTITE BLUE 243 is required 

as a threadlocker to secure the

installation of the Roller Screws.

LOCTITE is NOT provided with the doors, 

but is readily available at many hardware 

stores, online at mscdirect.com or through 

Mincey Marble at 1-800-533-1806.

Содержание Arezzo Bypass Barn Door

Страница 1: ...oor Shower Enclosure System In these instructions we are going to use an example with a 60 wide shower All Drawings Are Not To Scale 8QFUDWH DOO RI WKH PDWHULDOV DQG FRQ UP WKDW DOO RI WKH SDUWV DQG SLHFHV DUH SUHVHQW The Required Tools are listed below The contents of the Hardware Kit are listed below The Parts Diagram is on the following page Before you begin the installation make sure that all ...

Страница 2: ...MBLY CODE ASSEMBLY NAME QTY 1 GLASS PANEL 2 2 VERTICAL WALL CHANNELS 2 3 GUIDE RAIL 1 4 WATER GUARD 1 5 TOWEL BARS 2 6 ROLLERS 4 7 DOOR PANEL RETENTION PIECE 4 8 DOOR GUIDE 1 9 BUMPERS 8 10 BUMPER SCREW CAPS 8 11 DOOR SIDE GUIDES 2 12 7 16 PAN HEAD SCREWS 8 13 1 1 4 PAN HEAD SCREWS 8 14 WALL ANCHORS 8 PRE INSTALLATION PIECES PARTS LIST cont 2 ENCLOSURE PART LIST KEY 1 2 3 4 5 6 6 7 7 8 9 5 2 10 11...

Страница 3: ...ER DOOR GUIDE INTO THE WATER GUARD USING THE TAB ON THE END OF THE GUIDE CENTER LOOSELY ON WATER GUARD WILL INSTALL PERMANENTLY LATER Next Mark and Drill the holes for the LEFT VERTICAL WALL CHANNEL making sure it is Plumb with the Level Also be sure to center the VERTICAL WALL CHANNEL on the Shower Pan Curb Clean up any debris or shavings Install the WALL ANCHORS in the Wall Panels in the three T...

Страница 4: ...HANNEL FOLLOWING THE SAME INSTRUCTIONS AS THE LEFT VERTICAL WALL CHANNEL MEASURE TO CENTER OF PAN CURB BETWEEN THE VERTICAL WALL CHANNELS AND MARK HOLES TO DRILL SLIDE CENTER DOOR GUIDE OUT OF WAY DRILL HOLES WITH 5 16 MASONRY BIT CLEAN DEBRIS FILL HOLES WITH 100 SILICONE INSTALL PLASTIC ANCHORS INSTALL CENTER DOOR GUIDE WITH 1 1 4 SCREWS AND SCREW CAPS 1RZ RX FDQ LQVWDOO WKH 1 225 8 6 7KH 1 225 8...

Страница 5: ...AM LOBE DOWN GLASS DOWN You are now ready to install the GUIDE RAIL Before you install the GUIDE RAIL it is recommended to place one of the GLASS PANELS inside the Shower with the ROLLERS facing outward This will make it easier to install the Back Glass Panel after the GUIDE RAIL has been installed Be sure to protect the bottom of the GLASS PANEL and the Shower Pan Next you will prepare to install...

Страница 6: ... THE FACTORY SLOTS OF THE WALL CHANNELS THE WEIGHT OF THE GLASS PANELS WILL HOLD THE GUIDE RAIL FIRMLY IN PLACE To install the GLASS PANELS begin with the BACK GLASS PANEL that is already placed inside the Shower Carefully align the bottom of the GLASS PANEL into the CENTER DOOR GUIDE located on the WATER GUARD as you hang the ROLLERS onto the GUIDE RAIL Make sure the ROLLERS are facing out of the...

Страница 7: ...O ANY MOISTURE CAM LOBE UP PIECE DOWN CAM LOBE DOWN PIECE UP RAISE RETENTION PIECES TO WHERE A CREDIT CARD OR A KEY CARD WILL SLIDE BETWEEN THE RETEN TION PIECE AND THE GUIDE RAIL ALLOWING FOR SECURE SMOOTH GLIDING OPERATION OF THE GLASS PANELS You are now ready to install the FRONT GLASS PANEL Carefully align the bottom of the GLASS PANEL into the CENTER DOOR GUIDE located on the WATER GUARD as y...

Отзывы: