- 2.2 -
Operation
The following shows a series of operations and settings, ranging from power-on to end of
plotting. For details on each item, refer to the reference page.
Turn on the power on
P. 2.3
Check the head height
P. 2.6
Set the media
P. 2.8
Turn on the power of the heater
P. 2.20
Adjust the temperature
Plot the test pattern
P. 2.22
Correct the media feed rate
P. 2.24
Start the plotting
P. 2.26
Turn off the power
P. 2.31
Содержание JV3-130SPII
Страница 2: ......
Страница 34: ...1 16...
Страница 66: ...2 32...
Страница 92: ...4 16...
Страница 149: ......
Страница 150: ...Printed in Japan MIMAKI ENGINEERING CO LTD IT FW 7 5...