— 1.7 —
Right-hand side face of the electrical box
Blower unit (Option)
Name
Function
1
Power switch
Used to turn on/off the power to the blower unit. Normally, it is set to the
on position. Turn it off when conducting maintenance works.
2
Power connector
The power cable for the blower is connected to this connector.
3
Signal wire connector
To be connected, using a signal wire, to the signal wire connector for the
blower on the electrical box.
Name
Function
1
Power connector
To be connected to the power cable of the plotter.
2
Main power switch
Used to turn on/off the main power of this device. Normally set it to the on
state. Set it to the off state when conducting maintenance works.
3
Foot switch connector
Foot switch for vacuum is connected to this connector. (Optional)
Note: The shape of this connector may differ from that shown in the photograph.
4
RS-232C interface
To be connected to a personal computer using an interface cable.
5
IC card slot
To be used when conducting maintenance works.
6
Signal wire connector for
To be connected to the blower unit (option) using a signal wire.
blower
7
Optional connector
Connector to support particular purpose use.
1
2
3
4
5
6
7
1
2
3
• When using a separately sold
blower that differs from the
standard blower, there may be
no power switch. For the out-
put voltage, refer to the value
display on the blower unit.
Содержание CF2 Series
Страница 26: ...1 10 Operation panel VACUUM POWER X Y PAGE C E E N D ORIGIN REMOTE LOCAL F1 F2 F3 1 2 3 4 9 8 6 5 7 10 11 12 13...
Страница 48: ...1 32...
Страница 120: ...3 24...
Страница 138: ...4 18...
Страница 176: ...A 12 C OUTPUT SAMPLES Cutting quality 1 Cutting quality 2...
Страница 177: ...A 13 ASCII dump list Sample coated...
Страница 178: ...A 14 Sample E corrugated Sample B corrugated...
Страница 179: ...A 15 Circle cutting R 3 5 10 20 50 100 Parameter dump list R 3 R 5 R 10 R 20 R 50 R 100...
Страница 185: ......
Страница 186: ...D201402 1 30 16062008 MIMAKI ENGINEERING CO LTD 2008 EM FW 2 50...