R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
(
2
of
)
Page
1
1
Litho
in
U.S.A.
Shuttle
&
Rail
Installa
tion
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
COSHP
,
COSHM,
COSHQ1
1
1/1
12,
COLFP
,
COLFM,
COLFQ1
1
1/1
12
MIQCOSHMCE/2012333A
No
gap
Floor
Rail
Support
Bracket
Floor
rails
Anchor
Anchor
Grout
Grout
Z
Finished
Floor
Rail
Installa
tion:
F
loor
Rails
Rail
Leveling
Plates
Shim
&
level
to
System
Zero
Line
or
Z.
All
floor
rails
must
be
along
the
entire
length
of
rail.
Locate
each
rail
support
bracket
and
level
uneven
finished
floor
with
,
with
a
minimum
of
1”(25MM)
of
grout,
under
and
around
all
floor
rail
support
brackets.
Use
rail
leveling
plates
to
fill
the
gap
and
level
the
rail.
Make
sure
there
is
no
gap
between
floor
rails
and
floor
rail
support
brackets.
Grout
&
anchor
all
brackets.
Anchor
the
rail
at
all
floor
rail
support
brackets,
both
sides.
See
(Page
4
o
f
11)
and
Dimensional
Drawing
for
proper
placement
of
floor
rails.
level
and
square
grout
CA
UTION:
22
Содержание COLFM 111
Страница 2: ......
Страница 4: ......
Страница 5: ...Safety Information 1 1 ...
Страница 22: ......
Страница 23: ...Installation 2 19 ...
Страница 48: ......
Страница 49: ...Service and Maintenance 3 45 ...
Страница 88: ......
Страница 89: ...Dimensional Drawings 4 85 ...
Страница 90: ......
Страница 91: ...87 ...
Страница 92: ...88 ...
Страница 93: ...89 ...
Страница 94: ......
Страница 95: ...91 ...
Страница 96: ......
Страница 97: ...93 ...
Страница 98: ...94 ...
Страница 99: ...95 ...
Страница 100: ...96 ...
Страница 101: ...97 ...
Страница 102: ...98 ...
Страница 103: ...99 ...
Страница 104: ...100 ...