R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P
.
O.
Box
400,
Kenner
,
L
A
70063-0400
(Sheet
9
o
f
1
1)
Litho
in
U.S.A.
Shuttle
&
Rail
Installa
tion
COSHP
,
COSHM,
COSHQ1
1
1/1
12,
COLFP
,
COLFM,
COLFQ1
1
1/1
12
MIQCOSHMCE/2012333A
Hoist
Installa
tion:
Mounting
Chain
Lubrica
tion
Electrical
Connection
Check
lift
plate
to
see
if
it
properly
actuates.
Loose
chain
switch
Check
the
chain
to
insure
it
is
not
twisted.
Lubricate
the
chain
per
hoist
manufacturer
’s
recommendation.
See
hoist
manual.
Hoist
Motor
Hoist
Power
Supply
Cable
29
Содержание COLFM 111
Страница 2: ......
Страница 4: ......
Страница 5: ...Safety Information 1 1 ...
Страница 22: ......
Страница 23: ...Installation 2 19 ...
Страница 48: ......
Страница 49: ...Service and Maintenance 3 45 ...
Страница 88: ......
Страница 89: ...Dimensional Drawings 4 85 ...
Страница 90: ......
Страница 91: ...87 ...
Страница 92: ...88 ...
Страница 93: ...89 ...
Страница 94: ......
Страница 95: ...91 ...
Страница 96: ......
Страница 97: ...93 ...
Страница 98: ...94 ...
Страница 99: ...95 ...
Страница 100: ...96 ...
Страница 101: ...97 ...
Страница 102: ...98 ...
Страница 103: ...99 ...
Страница 104: ...100 ...