
R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P.
O.
Box
400,
Kenner
,L
A
70063-0400
Litho
in
U.S.A.
BMP040052/2004333V
(Sheet
1
of
2)
W
ater
&
Steam
Sc
hema
tic
3626X8J
,X8W
4226X7J
,X7W
4232X7J
,X7W
8
9
10
11
12
13
STRAINER
MUST
BE
CLEANED,
SEE
“PREVENTIVE
MAINTENANCE”
IN
THE
TABLE
OF
CONTENTS.
PRESSURE
REGULA
TO
R
MUST
REMAIN
SET
AT
FACT
OR
Y
SETTING
OF
28
PSI.
SEE
BMP900031
FOR
MAINTENANCE
PROCEEDURES.
DRAIN
1
2
2
57
6
34
HOT
W
AT
ER
FOR
FLUSHING
HOT
W
ATER
COLD
W
ATER
OPTIONAL
STEAM
OPTIONAL
COOLDOWN
*
*
**
**
VA
LV
E
ASSEMBL
Y
OPTIONAL 5
C
OMP
AR
TMENT
SUPPL
Y
ST
ANDARD
SOAP
CHUTE
ST
ANDARD
PERIST
AL
TIC
INLETS
SEE
BMP920029
SEE BMP700710
SEE BMP920017
SEE
BMP920007
SEE
BMP900031
Содержание 36026X8J
Страница 12: ...Safety Suspended Open Pocket Non tilting Washer Extractors PELLERIN MILNOR CORPORATION End of BIUUUS27 ...
Страница 24: ......
Страница 25: ...Section 1 Service and Maintenance ...
Страница 31: ......
Страница 52: ......
Страница 63: ...Section 2 Drive Assemblies ...
Страница 65: ......
Страница 69: ......
Страница 73: ...Section 3 Suspension ...
Страница 80: ......
Страница 81: ...Section 4 Shell and Door Assemblies ...
Страница 87: ...Section 5 Water and Steam Piping and Assemblies ...
Страница 95: ......
Страница 97: ......
Страница 99: ......
Страница 104: ......
Страница 105: ...Section 6 Chemical Supply Assemblies ...
Страница 117: ...Section 7 Control and Sensing Assemblies ...
Страница 120: ......
Страница 121: ...Section 8 Pneumatic Assemblies ...
Страница 123: ...Section 9 Dimensional Drawings ...
Страница 124: ......
Страница 125: ......
Страница 126: ......