OM-287348 Page 18
input2 2012
−
05
!
Installation must meet all National and
Local Codes
−
have only qualified per-
sons make this installation.
!
Disconnect and lockout/tagout input
power before connecting input con-
ductors from unit. Follow established
procedures regarding the installation
and removal of lockout/tagout
devices.
!
Always connect green or green/yellow
conductor to supply grounding termi-
nal first, and never to a line terminal.
See rating label on unit and check input volt-
age available at site.
For Three-Phase Operation
1
Input Power Cord.
2
Disconnect Device (switch shown in the
OFF position)
3
Green Or Green/Yellow Grounding
Conductor
4
Disconnect Device Grounding Terminal
5
Input Conductors (L1, L2 And L3)
6
Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding ter-
minal first.
Connect input conductors L1, L2, and L3 to
disconnect device line terminals.
7
Over-Current Protection
Select type and size of over-current protec-
tion using Sections
(fused disconnect
switch shown).
Close and secure door on disconnect device.
Follow established lockout/tagout procedures
to put unit in service.
4-7. Connecting 3-Phase Input Power (Continued)
Notes
Содержание 059015051
Страница 4: ......
Страница 5: ......
Страница 57: ...Notes Securely connect work clamp to a clean area close to the weld joint Welding Tip...
Страница 58: ...Notes Work like a Pro Pros weld and cut safely Read the safety rules at the beginning of this manual...