17
At this stage of the installation, the opener should be installed on the
gate and the open and closed position stops should be in place.
Check List
• The gate is plumb, level, and swings smoothly on its hinges.
• After measuring with the 4
1
/
2
" x 4
1
/
2
" setback template, the post bracket assembly
was bolted to the fence post.
• A plate or support was added for the gate bracket (if necessary).
• The opener is level and mounted on the centerline of the gate.
Closed Position Stop Plate
Open Position Stop Post
(set in concrete)
Open Position Stop Post
(set in concrete)
Gate In Open Position
Gate In Closed Position
CL
Содержание FM700
Страница 39: ...35 Accessory Catalog AUTOMATIC GATE OPENER...