Installation
*
I
N
S
T
A
L
L
A
T
I
O
N
*
34
Checking the building-in niche
Check the installation dimensions
(see “Installation – Building-in dimen-
sions”).
Check the position of the electrical
connection. The length of the elec-
trical connection cable is 3 m.
The electrical socket must not be
concealed behind the appliance and
must be easily accessible in an
emergency.
Check the surroundings for possible
collisions (see “Installation – Dimen-
sions with appliance door open”).
Only install the refrigeration appliance
in stable, solid building-in niches, po-
sitioned on an even and level floor.
Also check the building-in niche for
the following criteria:
– The side walls of the building-in niche
must be even.
– The surrounding walls of the building-
in niche must be at least 16 mm
thick.
– The surrounding walls must be se-
curely fixed to the floor or wall.
– Shortened side walls must be at least
100 mm deep.
Before installation
Before installation, remove any ac-
cessories from the back of the appli-
ance.
Check the refrigeration appliance for
transport damage.
Do not install a damaged refrigera-
tion appliance.
Check that all parts at the back of the
appliance are unhindered.
To protect the floor during installation,
secure an off-cut of flooring or similar
material to the floor in front of the in-
stallation area.
Содержание K 2601 Vi
Страница 30: ...Installation I N S T A L L A T I O N 30 K 2801 Vi K 2811 Vi 756 mm 2029 mm 102 132 mm ...
Страница 31: ...Installation I N S T A L L A T I O N 31 K 2901 Vi K 2911 Vi 908 mm 2029 mm 102 132 mm ...
Страница 114: ......
Страница 116: ...M Nr 11 273 020 00 en GB K 2601 Vi K 2611 Vi K 2801 Vi K 2811 Vi K 2901 Vi K 2911 Vi ...