Maintenance measures
134
Activating a test
program
Test programs are valid for only one program sequence each time. A
test program must be selected again for further tests.
Open the menu as follows:
button
Additional settings
Test program
Test program
Laboratory
No
-
No
The menu is exited without selecting a program.
-
Laboratory
Activates the Laboratory test program.
-
Validation
Activates the Validation test program.
Select an option using the
and
arrow buttons.
Press
OK
to activate the test program for the next program start.
You can now start the performance test.
Select and start a program using the program selection buttons or
via the program list.
The program will be identified in the bottom line as
Test program
dur-
ing the program sequence.
If you want to deactivate the test program before the performance
test you need to go to the next menu level up and select the
No
op-
tion.