10½"
3' 10"
2' 4"
PREPARE:
FIRE PIT DIMENSIONS
TABLE OF CONTENTS
Level 1 - Level 4
Materials List
Tool Check List
Foundation Guidelines
ASSEMBLE:
Finished Elevations
Use and Maintenance
ENJOY:
2
3
3
5
6
7
4
PREPARE
TECHNIQUES
Fasten each layer of block together with
¼” - ⅜" bead of construction adhesive on
all adjacent block faces unless otherwise
noted. Refer to the construction adhesive’s
application instructions for proper use.
INSTALLATION INSTRUCTIONS
* Do not over apply adhesive. It may reduce effectiveness.
Use mineral spirits to remove any unwanted adhesive.
Follow suggestions on page 3 to build a proper foundation before starting your new project. If
not already set, place the first level of block 1"- 2" below grade, level and fill in any gaps. Use
Level 1 as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to
adhering each level to the previously laid block, place the entire level of blocks and check to
make sure it fits properly. Remove small sections at a time to place the adhesive.
Let adhesive dry for a minimum of two days before using the table.