background image

Tumbled Belgian Wall Block (W)

Tumbled Belgian Wall Block (S)

TUMBLED BELGIAN WALL BLOCK

179-3649

179-3647
179-3652

179-3639

Wedge

179-3731

179-3732

Sienna

Quarry Gray

Tan

Autumn Blend

Small

Color

PRODUCT:

Tumbled Belgian Wall (W)

Tumbled Belgian Wall (S)

QUANTITY

48

48

CONCRETE BLOCK MATERIALS

ADDITIONAL MATERIALS

PRODUCT:

Fire Pit Adhesive

28

"

 Fire Ring

DESCRIPTION

10 oz Ube

Steel

QUANTITY

3

1

SKU#

638-4313

259-5005

DESCRIPTION

Color of Choice

Color of Choice

179-3733

179-3734

2

PREPARE

Содержание Menards ALBANY

Страница 1: ...dwestmanufacturing com Approximate Weight 600 lbs Approximate Size 3 10 exterior diameter x 2 4 interior diameter x 10 H ALBANY FIRE PIT Autumn Blend 198 9234 Quarry Gray 198 9231 Sienna 198 9232 Tan 198 9233 ...

Страница 2: ...3732 Sienna Quarry Gray Tan Autumn Blend Small Color PRODUCT Tumbled Belgian Wall W Tumbled Belgian Wall S QUANTITY 48 48 CONCRETE BLOCK MATERIALS ADDITIONAL MATERIALS PRODUCT Fire Pit Adhesive 28 Fire Ring DESCRIPTION 10 oz Ube Steel QUANTITY 3 1 SKU 638 4313 259 5005 DESCRIPTION Color of Choice Color of Choice 179 3733 179 3734 2 PREPARE ...

Страница 3: ...quired prepare a leveling pad using the procedures listed in the paragraphs above The concrete shall have a minimum compressive strength of 2500 psi A 4 inch thick concrete slab should be more than sufficient A thickened edge and reinforcement of the leveling slabs may be required Please consult a professional engineer for specific requirements TIPS FOR BUILDING LEVELING PADS 3 PREPARE These plans...

Страница 4: ... It may reduce effectiveness Use mineral spirits to remove any unwanted adhesive Follow suggestions on page 3 to build a proper foundation before starting your new project If not already set place the first level of block 1 2 below grade level and fill in any gaps Use Level 1 as a reference to place the blocks for all remaining levels Refer to the illustrations on the following pages to guide you ...

Страница 5: ...mbled Belgian Wall W 16 Tumbled Belgian Wall S Level 1 Level 2 Level 4 Level 3 ASSEMBLE 5 16 Tumbled Belgian Wall W 16 Tumbled Belgian Wall S 16 Tumbled Belgian Wall W 16 Tumbled Belgian Wall S 1 28 Fire Ring ...

Страница 6: ...ELEVATION PERSPECTIVES Top View Side View 6 ENJOY ...

Страница 7: ...urning regulations in your area and never leave a fire unattended Use and Maintenance Fire Pit Maintenance Clean your fire pit often Wait until the fire has burned out completely and all ashes have cooled before cleaning the fire pit Begin by removing the larger pieces of debris the remaining ash can be scooped out and or lightly sprayed with a hose to rinse away ...

Отзывы: