background image

A solid foundation is necessary to prevent settling and tiling of each project. We recommend using a 

leveling pad, unless local building code requires you to pour a concrete foundation or build another type 

of foundation.

***Fire rings should be placed on stone, dirt, or sand surfaces. Pavers or concrete can be 

installed around fire rings, but should not be under fire rings. Fire rings should not be placed on wood or 

composite decking surfaces.

FOUNDATION:

•  Choose the location for the completed project; place and mark the position of the base layer 

of blocks. Once marked, remove the blocks and the organic top soil within the marked area.

•  If applicable to your area, create a leveling pad with a non-frost susceptible, well graded, 

compacted angular gravel-sand mixture with fines (GW as per ASTM D248). The leveling pad 

should be a minimum of 4 to 6 inches thick. For leveling pads greater than 8” thick, the fill 

material shall be placed in more than one lift. Each layer or lift of fill material shall be leveled 

and compacted to a 95% Standard Proctor density before moving on. 

•  Once the top layer of fill material is compacted and level, place the base layer of blocks. 

The base layer should sit 1 to 2 inches below grade to help further prevent shifting. Use 

additional fill material to level the base layer as needed.

* If a concrete slab is required, prepare a leveling pad using the procedures listed in the paragraphs above. The 

concrete shall have a minimum compressive strength of 2500 psi. A 4-inch thick concrete slab should be more 

than sufficient. A thickened edge and reinforcement of the leveling slabs may be required. Please consult a 

professional engineer for specific requirements.

TIPS FOR BUILDING LEVELING PADS:

3

PREPARE

These plans will walk you through each step as you Prepare, Assemble and Enjoy the new addition to 

your yard. Check out the Progress Bar at the bottom of each page to track your advancements as you 

complete each phase of your project! 

INSTRUCTIONS:

PREPARE

ASSEMBLE

ENJOY

It is the responsibility of the owner to ensure compliance with all applicable laws, codes and regulations 

for any project. Proper safety precautions must be taken prior to and during the construction of each 

project. Please follow standard safety guidelines and wear necessary protective equipment when 

building and using your new backyard addition. 

RESPONSIBILITIES:

Rubber Mallet

Level

Utility Knife

Caulk Gun

Protective Equipment

Tape Measure

TOOL CHECK LIST

 

•  Please research and 

follow local building 

codes prior to the 

excavation, construction 

and assembly of your 

project. 

•  Exercise caution when 

you work with concrete 

block designs. 

Wear protective safety 

equipment such as safety 

glasses, dust masks, 

gloves and a hard hat.

•  Whether you plan to build  

the project yourself or to 

hire a professional, every 

project requires a call to 

mark your utility lines.

BEFORE YOU BEGIN:

Содержание Menards ALBANY

Страница 1: ...dwestmanufacturing com Approximate Weight 600 lbs Approximate Size 3 10 exterior diameter x 2 4 interior diameter x 10 H ALBANY FIRE PIT Autumn Blend 198 9234 Quarry Gray 198 9231 Sienna 198 9232 Tan 198 9233 ...

Страница 2: ...3732 Sienna Quarry Gray Tan Autumn Blend Small Color PRODUCT Tumbled Belgian Wall W Tumbled Belgian Wall S QUANTITY 48 48 CONCRETE BLOCK MATERIALS ADDITIONAL MATERIALS PRODUCT Fire Pit Adhesive 28 Fire Ring DESCRIPTION 10 oz Ube Steel QUANTITY 3 1 SKU 638 4313 259 5005 DESCRIPTION Color of Choice Color of Choice 179 3733 179 3734 2 PREPARE ...

Страница 3: ...quired prepare a leveling pad using the procedures listed in the paragraphs above The concrete shall have a minimum compressive strength of 2500 psi A 4 inch thick concrete slab should be more than sufficient A thickened edge and reinforcement of the leveling slabs may be required Please consult a professional engineer for specific requirements TIPS FOR BUILDING LEVELING PADS 3 PREPARE These plans...

Страница 4: ... It may reduce effectiveness Use mineral spirits to remove any unwanted adhesive Follow suggestions on page 3 to build a proper foundation before starting your new project If not already set place the first level of block 1 2 below grade level and fill in any gaps Use Level 1 as a reference to place the blocks for all remaining levels Refer to the illustrations on the following pages to guide you ...

Страница 5: ...mbled Belgian Wall W 16 Tumbled Belgian Wall S Level 1 Level 2 Level 4 Level 3 ASSEMBLE 5 16 Tumbled Belgian Wall W 16 Tumbled Belgian Wall S 16 Tumbled Belgian Wall W 16 Tumbled Belgian Wall S 1 28 Fire Ring ...

Страница 6: ...ELEVATION PERSPECTIVES Top View Side View 6 ENJOY ...

Страница 7: ...urning regulations in your area and never leave a fire unattended Use and Maintenance Fire Pit Maintenance Clean your fire pit often Wait until the fire has burned out completely and all ashes have cooled before cleaning the fire pit Begin by removing the larger pieces of debris the remaining ash can be scooped out and or lightly sprayed with a hose to rinse away ...

Отзывы: