ASSEMBLY INSTRUCTIONS
Push the swaged ends of each rail into the non-swaged ends of each adjacent rail, making sure all pieces are pushed
in completely and put together firmly.
1.
2.
3.
3.
A
Swaged
A
D
C
E
B
Place the Bottom U-Shaped Rails (A) on the sides as shown. The small pegs on the Bottom U-Shaped Rails must point
up. In the front, place a Short Filler Rail (D), Long Filler Rail (B), and the two sections of the Gate Frame (E) on the ground
as shown. Place two Medium Filler Rails (C) in the back.
Note the placement of the swaged ends on each rail.
Connect the two sides of the Gate Frame. Using a Small Bolt, Nut, and Acorn Nut (Q), secure the two sections
together at the top and the bottom of the frame.
C
Swaged
Swaged
Swaged
Swaged
Swaged
Swaged