Service manual
16
8. Installation details
8.1 Wrench torque sheet for installation
Outside diameter
Torque
mm
inch
Kg.m
φ
6.35
1/4
1.8
φ
9.52
3/8
4.2
φ
12.7
1/2
5.5
8.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
7K
9K
12K
mm
2
1.0
1.0
1.5
8.3 Pipe length and the elevation
Capacity
Btu/h
Pipe size
Standard
length
(m)
Max.
Elevation
B (m)
Max. Pipe
length
A (m)
Additional
refrigerant
(g/m)
GAS
LIQUID
07k~09K
3/8’’ (
φ
9.52)
1/4’’ (
φ
6.35)
5
5
10
30
12K
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
5
10
30
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
In case that
more than 5m.
All manuals and user guides at all-guides.com
Содержание MSQ-07CR
Страница 9: ...Service manual 6 3 2 Outdoor unit MSQ 07 09C H R All manuals and user guides at all guides com...
Страница 10: ...Service manual 7 MSQ 12C H R All manuals and user guides at all guides com...
Страница 17: ...Service manual 14 MSQ3 07HR MSQ3 09HR MSQ3 12HR MSQ3 12HR All manuals and user guides at all guides com...
Страница 18: ...Service manual 15 All manuals and user guides at all guides com...