22
5.3.5 Re-installation while the indoor unit need to be repaired
1. Collecting the refrigerant into the outdoor unit
Procedure
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service
port.
3). Air purging of the charge hose
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose
for 5 seconds and then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates
0.1MPa.
Содержание MFGA-60ARDN1-QC2
Страница 1: ...SERVICE MANUAL AIRCONDITIONER FLOOR STANDING TYPE Model MFGA 60ARDN1 QC2 ...
Страница 6: ...3 2 Dimension 2 1 Indoor Unit Dimension Mode W mm D mm H mm MFGA 60ARDN1 QC2 610 390 1925 ...
Страница 7: ...4 2 2 Outdoor Unit MODEL A B C D E F H MOU 60HDN1 R 940 600 376 400 340 360 1245 ...
Страница 9: ...6 4 Wiring diagram MFGA 60ARDN1 QC2 Indoor Unit Outdoor Unit ...