R410A, make the cylinder bottom up to ensure
liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder
and press the check valve on the charge set to
purge the air (be careful of the liquid
refrigerant).
3) Put the charging cylinder onto the electronic
scale and record the weight.
4) Operate the air conditioner at the cooling
mode.
5) Open the valves (Low side) on the charge set
and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper
weight (refer to the gauge and the pressure of the
low side), disconnect the charge hose from the
3-way valve’s service port immediately and turn
off the air conditioner before disconnecting the
hose.
7). Mount the valve stem caps and the service
port
Use torque wrench to tighten the service port
cap to a torque of 18N.m.
Be sure to check for gas leakage.
6.6 Re-installation while the indoor unit
need to be repaired
1. Collecting the refrigerant into the outdoor
unit
Procedure
1). Confirm that both the 2-way and 3-way valves
are set to the opened position
Remove the valve stem caps and confirm that the
valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the
valve stems.
2). Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle
and
stop it
when
the gauge
indicates
0.1Mpa(14.5Psi).
6). Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up
indicating
0.3Mpa(43.5Psi) to 0.5 Mpa(72.5Psi).
Disconnect the charge set, and tighten the 2-way
and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2.Air purging with vacuum pump
1) Completely tighten the flare nuts of the indoor
and outdoor units, confirm that both the 2-way
and 3-way valves are set to the closed position.
2) Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3) Connect the charge hose of handle hi
connection to the vacuum pump.
4) Fully open the handle Lo of the manifold valve.
5) Operate the vacuum pump to evacuate.
6) Make evacuation for 30 minutes and check
whether the compound meter indicates
-0.1Mpa(14.5Psi). If the meter does not indicate
-0.1Mpa(14.5Psi) after pumping 30 minutes, it
Содержание MCHS-09PSH1
Страница 1: ...Mission 3D Inverter Series Service Manual 2016 MBSUL A 1604...
Страница 8: ...For 9k 12k For 18k 24k For 30k 36k...
Страница 11: ...5 Wiring Diagram 5 1 Indoor Unit MEHS 09PSH1 MEHS 12PSH1 MEHSU 09PHH2 MEHSU 12PHH2...
Страница 12: ...MEHSU 18PHH2 MEHSU 24PHH2 MEHS 30PSH2 MEHS 36PSH2...
Страница 13: ...5 2 Outdoor Unit MCHS 09PSH1 MCHS 12PSH1 MCHSU 09PHH2 MCHSU 12PHH2 MCHSU 18PHH2...
Страница 14: ...MCHSU 24PHH2 MCHS 30PSH2 MCHS 36PSH2...
Страница 45: ...P W N U...
Страница 46: ...N V N W...
Страница 78: ...compressor on bottom plate 4 Lift the compressor from the base pan assembly 3...